Page 177 - Installation Training Binder FIT1-3
P. 177
Tools Required to Install Liner
q T-Square or Straight Edge (at least 4’ long and preferably non-metallic)
q Measuring Tape (non-metallic)
q Duct Tape
q Utility Knife with Standard and Hook Blades
q Side Cutters (Snips)
q Chalk Line
q Marking Pens (ballpoint pens work best)
q Rubber or latex throw away gloves
q Specific Thermal Bonding Tool Kit