Page 180 - Installation Training Binder FIT1-3
P. 180
Tools Required to Install EnviroGuard
UL Listed Spill Containment
q Anchor Setting tool (Provided)
q Standard Anchors/washers and bolts (Provided)
q Sealant Gun (Provided)
q Sealant (Provided)
q Corrosive resistant liner (Provided)
q Barrier walls and Extrusion Clips (Provided)
q UL Recognized Pillows and Soc’s (Provided)
q Hammer Drill
q 3/8” Drill Bit for Hammer Drill
q Hammer
q Ratchet with 7/16” socket (Impact driver with extension and socket)
q 7/16” Box End Wrench
Note: These tools are required in addition to the tools previously
mentioned for Liner installation.