Page 180 - Installation Training Binder FIT1-3
P. 180

Tools Required to Install EnviroGuard


                UL Listed Spill Containment






                    q Anchor	Setting	tool	(Provided)

                    q Standard	Anchors/washers	and	bolts	(Provided)
                    q Sealant	Gun	(Provided)


                    q Sealant	(Provided)
                    q Corrosive	resistant	liner	(Provided)

                    q Barrier	walls	and	Extrusion	Clips	(Provided)

                    q UL	Recognized	Pillows	and	Soc’s (Provided)

                    q Hammer	Drill

                    q 3/8”	Drill	Bit	for	Hammer	Drill

                    q Hammer

                    q Ratchet	with	7/16”	socket	(Impact	driver	with	extension	and	socket)

                    q 7/16”	Box	End	Wrench

                    Note:	        These	tools	are	required	in	addition	to	the	tools	previously

                                  mentioned	for	Liner	installation.
   175   176   177   178   179   180   181   182   183   184   185