Liner Preparation (Continued)








              3.     Measure	the	length	of	the	stanchions	to	insure	that	they	are	all	equal

              4.     Transfer	the	stanchion	length	to	the	liner	using	the	“width	center	line” as	a	guide.	When

                     complete,	there	should	be	3	parallel	lines	down	the	center	of	the	liner	as	shown.	Example:	19	¼”
                     long	stanchion,	center	the	tape	measurer	at	9	5/8” on	the	“width	center	line” and	mark	0” and
                     19	1/4” to	create	2	parallel	lines

              5.     Mark	the	liner	to	identify	the	“Front	&	Back” line	of	the	stanchions.	This	is	the	side	that	you	will

                     Thermal	Bond	from.	(If	rack	is	against	the	wall,	the	“front” is	always	the	open	aisle	side)