Page 194 - Installation Training Binder FIT1-3
P. 194
Liner Preparation (Continued)
11. Repeat the same process for
measuring the “back” line of
stanchion widths.
12. Repeat the same process for
transferring the “back” line of
stanchion widths to the liner.
13. Using a straight edge, connect
the “front and back” lines to
create your stanchion footprints
on the liner. Now that you have
established the exact
placement of the stanchions on
the liner and have multiple
reference points, you can
transfer any additional:
• Jogs, Abutments or
Obstructions