Page 194 - Installation Training Binder FIT1-3
P. 194

Liner Preparation (Continued)









             11. Repeat the same process for
                    measuring the “back” line of
                    stanchion widths.


             12. Repeat the same process for
                    transferring the “back” line of
                    stanchion widths to the liner.

             13. Using a straight edge, connect
                    the “front and back” lines to

                    create your stanchion footprints
                    on the liner. Now that you have
                    established the exact
                    placement of the stanchions on
                    the liner and have multiple

                    reference points, you can
                    transfer any additional:
                    •     Jogs, Abutments or

                          Obstructions
   189   190   191   192   193   194   195   196   197   198   199