Page 340 - Installation Training Binder FIT1-3
P. 340

Step 3

                   Liner Layout

                          Layout the liner, gray side up, within the chalk line area and measure to
                          confirm inside dimensions.  Using duct tape, secure the liner to the floor
                          and remove wrinkles and folds. (Figure 2)





                                                                           Apply Duct Tape Here
































                                                            Figure 2a



















                                                            Figure 2b



                   EnviroGuard  800-206-9884          Fax  909-624-1772                   www.egsintl.com
                   11/2007 rev. B            Condor Plus System Setup Instructions               Page - 5 -
   335   336   337   338   339   340   341   342   343   344   345