Page 10 - East Campus RFQ 2.14.2017
P. 10

10


         Transportation & Access



         The East Campus is conveniently located and has a variety of transit
         and  nearby  public  transportation  options.  The  Brookland-CUA
         Metro Station, located approximately three quarters of a mile away,
         is within a fifteen minute walk. Both the Fort Totten Metro Station
         connecting  red,  yellow,  and  green  lines  and  the  West  Hyattsville
         Metro Station are approximately 1.3 miles from the site. There are
         four bus lines (R4, H6, E2, 80) with stops less than 0.2 miles away.
         Car  sharing  is  available  from  Zipcar,  RelayRides  and  Hertz  On
         Demand.  Nearby  parks  include  Fort  Bunker  Hill  Park,  Barnard  Hill
         Park, and Neighborhood Park. The Project is easily accessible in one
         of the more walkable neighborhoods in Washington D.C., receiving
         a Walk Score of 75.

         The East Campus is located 2.4 miles to the northeast of Howard’s
         main campus.




         Zoning & Land Uses


         The  site  is  in  an  R-1-B  District  (with  Diplomatic  overlay),  which
         permits  matter-of-right  development  of  single-family  detached
         residential  uses,  churches,  public  recreation,  community  centers,
         and schools. Immediately adjacent to the site are institutional and
         low density residential areas.





                                    Minimum Lot
                   Height (ft.)¹/                      Lot                     Front Setback   Rear Yard (ft.)  Side Yard (ft.)   Pervious Surface  Zoning Regula-
                                  Width (ft.)/ Area
                     Stories                       Occupancy                                                             (minimum)      tion Reference
                                        (sf)
                                                                 A front setback shall be
                       40               50                      provided within the range
                                                                of existing front setbacks
                                                                of all structures within an                                               Subtitle D.
         R-1-B                                        40%                                      25             8             50%
                                                                 R-1-B zone on the same                                                   Chapter 3
                                                                 side of the street in the
                        3              5,000                   block where the building is
                                                                       proposed.


    EastCampus.datarooms.com
   5   6   7   8   9   10   11   12   13   14   15