Page 5 - White Estimate
P. 5

Estimate #
                                                                                                                  prelim
   Name / Address
   Emily and Dean White                                                                                           Date
   2362 New Jersey Ave
   San Jose CA 95124                                 ESTIMATE                                                    5/8/2017


   #    item            Description                                                                              Total
   43   Plumbing        rough and finish installation                                                             18,000.00
   44   Plumbing        optional recirculation line @ $400 per bathroom                                           1,200.00
   45   Plumbing Fixtures  provided by owners / installed by contractor
   46   Electrical      rough and finish installation                                                             33,600.00
   47   Electrical Fixtures  surface mounted fixtures (such as sconces) to be provided by owners and installed by contractor
   48   HVAC            assuming remove and replace all existing ductwork (highly recommended)                    11,800.00
   49   HVAC            HERS cerification                                                                           600.00
   50   Entertainment   by owners
   51   Security        by owners
   52   Insulation                                                                                                5,200.00
   53   Firesprinklers  fire protection / none shown on plans                                                     8,000.00
                        INTERIOR FINISHES
   54   Drywall         old world texture                                                                         20,400.00
   55   Painting        complete exterior repaint and new paint / interior new work and affected areas only       32,700.00
   56   Cabinets                                                                                                  27,000.00
   57   Specialty Painting  ALLOWANCE for cabinet stain and lacquer finish or paint @ $100 lin ft , pantry @ $300 lin  13,000.00
   58   Countertops     material ALLOWANCE $25 per sq ft                                                          7,980.00
   59   Countertops     ALLOWANCE labor to fabricate and install                                                  13,200.00
   60   Tile            materials ALLOWANCE $5 per sq ft including trim                                           2,100.00
   61   Tilework        ALLOWANCE labor and materials for installation                                            7,200.00
   62   Hardwood        living room, kitchen, fam.rm., office                                                     17,990.00
   63   Carpet           3 bedrooms and hall $40 per yd                                                           3,200.00
   64   Shower Doors    ALLOWANCE                                                                                 2,000.00
   65   Mirrors         ALLOWANCE                                                                                   400.00
   66   Appliances      provided and installed by owners
                        EXTERIOR FINISHES
   67   Finish Grading  by owners' landscaper
   68   Masonry         wanescot Alaska Grey panels / veneer over chimney                                         18,320.00
   69   Landscaping     any repairs or rerouting of existing water lines or controllers T&M
                        MISCELLANEOUS
   70   Final Cleaning  job swept, debris removed, windows washed....detailed cleaning by owners                    900.00
   71   Supervision     personal supervision by Craig Bauman included                                                 0.00
   72   Contingencies   no leveling of existing home included , no termite or dry rot repairs included                0.00
                        subtotal                                                                                 598,255.00
        Contractors O&P  overhead and profit                                                                     89,738.25
        Utility Connections  owners are responsible for fees/ hookups to service providers at completion of project regardless of any restrictions  0.00
                        or requirements imposed by moving points of entry



















                                                                              Total                       $687,993.25