               Michael Welz, CSI, CDT | Quality Assurance Director



               Mike began his association with Bernardon in 1986.  As Quality Assurance Director, his
               chief responsibilities include helping to maintain quality assurance procedures for the
               firm in order to build high quality into the construction design process and lessen the
               reliance on last-minute error detection. He also maintains a high level of experience and
               proficiency in building construction detailing, familiarity with AIA and CSI documents,
               and fluency with building code applications and industry-wide trends and innovations. His
               experience as an on-site representative, working closely with Owners and Construction
               Managers and maintaining document and specification compliancy during construction,
               has given him a unique understanding of the key considerations to look for during the
               QA process.

               Bernardon’s Quality Assurance Program is has several parts and the final
               review is an item-by-item, multi-step procedure of reviewing and checking the
               documents.  This process is performed on each element of the documents and
               coordinated with all trades.  Quality is managed through milestones identified   Education
               in the design process, allowing a thorough document review prior to issuing.     Bachelor of Architecture,
               Quality Control/Quality Assurance milestones include:                      Drexel University

                 Schematic Design Review                                                  Registrations & Certifications
                 The Quality Assurance Manager’s initial involvement begins by working with   Certified Construction Documents
                 the design team at the schematic design phase.  At this point, the initial design   Technologist (CDT), Construction
                 is evaluated and reviewed.  Any research required by unique project requirements   Specifications Institute (CSI)
                 are identified and performed by the project team under the review of the Quality   Certified Accessibility Inspector/
                 Assurance Manager.
                                                                                          Plans Examiner, International
                                                                                          Code Council (ICC)
                 Design Development Review
                 The project design and production team, in conjunction with the Quality Assurance   U.S. Army Corps of Engineers,
                 Manager and the firm Principals, expand the scope of technical review to specific   Construction Quality Management
                 materials and building systems planned for the project.  Project-specific consultant   for Contractors
                 coordination interface areas are identified and a process is developed to address
                 these issues during the course of construction document production.

                 Construction Document Review
                 During the Construction Documents phase, a full discipline project review is
                 undertaken.  The interdisciplinary team approach verifies that the construction
                 plans and all aspects of technical development and specifications are on-track.
                 All interior and exterior materials and engineering systems are finalized by each
                 discipline.




               BERNARDON | Proposal for Professional Design Services