Page 17 - Bernardon Industrial Statement of Qualifications
P. 17

Central Logistics Park

                                                                  Building 53

                                                                  | Myerstown, PA




                                                                  Bernardon  worked  as  part  of  a  design-
                                                                  build team for this 832,000 SF cross-dock
                                                                  speculative distribution building.


                                                                  The building has 36 foot clear height and
                                                                  site-cast load-bearing concrete panels.
                                                                  The Owner requested that the two corner
                                                                  entrances be designed as features to attract
                                                                  prospective tenants. Our design solution
                                                                  was to use tilt-up concrete in a creative
                                                                  way that provides depth to the façade with
                                                                  opening for generous amounts of glazing.








































                                                                                    INDUSTRIAL | www.bernardon.com
   12   13   14   15   16   17   18   19   20   21   22