        Project Approach







            Project Understanding


            CSC acquired a single-story building located on       design and Tim Kiser, AIA leading the architecture.
            the CSC campus at 201 Little Falls in Wilmington,     In addition, DEDC, LLC joins our team and will be
            DE. The goal is to renovate the building for the IT   responsible for mechanical, electrical, plumbing,
            Technology Group.  Proposed  renovations  include     and fire protection (MEPFP) engineering design.
            new interior partitions, ceilings, lighting, finish
            materials, video conferencing, and furniture. In      CSC has engaged Aegis Property Group and Asset
            addition, CSC is considering exterior upgrades for    Management  Alliance  to  interview  and  retain a
            the building’s rear entrance to create a more inviting   construction manager (CM) to assist in providing cost
            connection between the headquarters building and      estimating, monitoring schedules, and overseeing
            the 201 Building, a loading area, and improved        all construction activities. Bernardon believes in
            outdoor recreational space. We understand the         a  collaborative approach to design, where the
            project has an aggressive schedule with a kick-off    Owner and other vested parties participate in the
            to start immediately after the award of work, with a   design process to ensure that issues of functionality,
            target of completion in May 2023.                     constructability, code compliance, building systems,
                                                                  and construction costs are addressed alongside
            This project will be managed from Bernardon’s         aesthetic considerations in creating a state-of-the-
            Wilmington office location with Kerry Haber, AIA as   art office that supports CSC today and future IT
            the Principal-in-Charge. The Bernardon design team    technology strategies.
            will be led by Robin Tait, IIDA leading the interior



            BERNARDON | Response to Request for Proposal
            CSC | 201 Little Falls Renovation | September 27, 2022                                             Page 1
   1   2   3   4   5   6   7