Page 4 - Bernardon+CSC Response to RFP 220927
P. 4
www.bernardon.com
We have included this sketch image of a revised entry sequence to
help this building better connect to the existing building.
Also included on the following page is an aerial diagram that pairs
with this sketch image as it relates to enhancing the connection
between the two buildings.
BERNARDON | Response to Request for Proposal
CSC | 201 Little Falls Renovation | September 27, 2022 Page 3