Page 4 - Bernardon+CSC Response to RFP 220927
P. 4

www.bernardon.com













                     We have included this sketch image of a revised entry sequence to
                     help this building better connect to the existing building.



                     Also included on the following page is an aerial diagram that pairs

                     with this sketch image as it relates to enhancing the connection
                     between the two buildings.































































            BERNARDON | Response to Request for Proposal
            CSC | 201 Little Falls Renovation | September 27, 2022                                             Page 3
   1   2   3   4   5   6   7   8   9