Scope of Basic Services
Phase IV – Construction Administration
Bernardon will complete design services as outlined During construction, we can remain an integral part
below:
of the project team on an as needed basis to answer
questions, review product data and documentation,
Phase I – Conceptual + Schematic Design
and help resolve any issues that occur in the field.
We will meet with the project team several times
at the outset of the project to collectively develop Additional Services
and finalize a space program tailored to incorporate
the corporate culture, goals, and desires. Once Should supplementary needs reveal themselves
the space program is completed, we will create throughout the process, we are happy to assist and
a design concept, plan layout, and conceptual provide additional services as needed that can be
images for the building and office space – all while completed on a fixed fee or hourly basis. Examples
meeting regularly to review and refine the design.
of Additional Services and exclusions may include
but are not limited to the following:
Phase II – Design Development
The design developed in Schematic Design will be ■ Making Owner-requested revisions to
refined. We will evaluate proposed design changes previously approved drawings.
and/or improvements to finalize the building’s ■ Making “value engineering” changes to the
overall design and HVAC, electrical, and data needs. drawings after receipt of bids.
Concurrently, the interior design team will dive into ■ Pursuing LEED Certification (or similar) for
the finishing of the spaces focusing on materials, the building.
texture, color, and furniture. After the completion ■ Providing additional renderings or
of Phase II services, we will work with the CM and marketing material beyond schematic
Aegis to develop a project budget estimate.
design imagery.
■ Providing specification packages for
Phase III – Construction Documents Furniture, Fixtures, and Equipment.
Final decisions will be completed and ■ HVAC pre-reads are not included and may
memorialized. We will then create the detailed be needed to measure actual air flow from
documentation that New Castle County will the air handler(s).
require to issue a building permit, and the
CM will need to execute the construction.