Page 265 - Bahrain Gov Annual Reports (II)_Neat
P. 265

45
        1357. This was duo to extra load amounting to approximately 128 K.W. The
        nature of the new load connected during 1358 was as follows
                          Lighting & fans (1163 points) 58.0 K.W.
                          Power:—Motors             1G.0
                                  Heaters            8.0
                                  Ice Plant         22.0
                                  Refrigerators      1.0
                                  A.C. Units        13.0
                                  Miscel. apparatus  10.0
                                                   128.0 K.W.

              Revenue from units sold during 1358 amounted to Rs. 122,467-15-0 as
        compared with Rs. 102,811-4-0 in 1357. Increase: Rs. 19,650-11-0.
              227 new premises were connected during 1358 :—
                                In Man am ah   205
                               In Muharaq      22
              Total consumers connected to date 1,339. Maximum load recorded 167.
        Total kilowatts connected to dato 548 K.W. Capacity of generating plant 400
        K. V .A.
              Wiring Contracts:—
              The local wiring contractors continued wiring in the State during 1358.
        Premises wired were as follows :—
                       1.  Haji Salman Abdulla Zayani   69
                       2.  Haji Khalil Ebrahim Kanoo     7
                       3.  Mr. Yousuf Khalil Almoayed   49
                       4.  Messrs. M. & A. Koohiji      44
                       5.  Haji Abdul Rahinan Mohd. Zayani 8
             The last two contractors were licensed in 1358.
             The Department carried out the wiring of Government and certain other
       buildings including:—
                   Assistant Political Agent’s residence (Govt, house at Gudhabia)
                   Government Hospital — Female Block
                        >>       »         Lady Doctor's Flat
                                           Matron’s Flat
                        »        >>        Nurses’ Quarters.
                   New Passport Office,
                   Juma Mosque Minaret
             And a few other small premises.
             Temporary Wiring:—
             During the year 1358 Manamah and Muharraq were specially illuminated on
       jiwo occasions, once on H.M. King Ibn Baud’s visit to Bahrain, and once to celebrate
       the anniversary of the accession of H.H. Shaikh Hamed, Ruler of Bahrain. 1200
       extra lights were temporarily installed.
             Main Extensions:—
             A 400 volt, 8-pha6e pole line was run from the transformer at his Highness’s
       Palace (Gudhaibia) to the new Air Liaison Officer’s residence at Gudhaibia
       (distance approximately 750 yards). The cost wa6 partly borne by the R.A.F.





                                                                                        .