Page 115 - Bahrain Gov Annual Reports (I)_Neat
P. 115

113

             Other minor works were aa follows.-
               1.  Fencingif Palace garden.
               2.  Widening of bridge on Idari Road.
               3.  Store room for Land Department materials.
               4.  Construction of mile aud surfaced road on
                                     Meni road.
               5.  Rebuilding a beaoon off Budeya.
               6.  Rebuilding of bathing pool Uram al Mishum.
               Idari Water Channel.    The work on the water channel was
          completed. The 3ides and bottom of the channel have been built
          of cement on concrete and this has resulted in a very great
          saving of water. The work was paid for by the owners of the
             >
          property which is irrigated from Idari Spring and the
          Government contributed fis. 2000/- as a return for the road which

          runs alongside the channel being put in order. Cost Rs. 21000/-.
              Maharak-Manama Sea Road. This formidable undertaking has
          not yet been commenced.    Application has been made for the
          services of an Engineer from the Government of India to advise
          on the practicability of the scheme.
                   The distance is about one mile, across the sea which

          at low tide becomes almost dry ground except for a channel of
          unknown depth some 800 feet wide which would necessitate a
          ferry or a bridge.   A very powerful current rushes through
          this channel.  The entire road would have to face the full
          strength of the shamal wind and heavy seas.    The whole popula­
          tion of Manama and Maharak are intensely anxious that this

          road should be built.
              Electric Scheme, Manama.    A contract has been made with
          Messrs. Callender's Cable and Construction Co.Ltd. for the
                                                           iejin
          electrification of Manama town.   The work is to \Npvug in
          September. The power-house is to be built in a corner of the
          Municipal Garden, a very central position. The Bystem is

          alternating current supplied by two engines which will be
          capable in the future of supplying Maharak.
                  The amount of the contract is £ 20607/17/8. which
          has been set aside for this purpose in Bombay.