Page 26 - William Ferris Portfolio
P. 26

    2004 PROTOTYPES | TARGET
The rendering above conveys the final design, finishes, and color composition for the 2004 prototypes. Most of the plan changes shown on this reference plan were focused on the “front of house” spaces. In addition, significant changes were made to the sales floor adjacencies. Eventually, the piers along the building front were eliminated and the storage module adjacent to the entry vestibule was converted to a red signature wall (shown on the plan and elevation above).
 WILLIAM FERRIS AIA   CID
1 25
 TARGET | 2004 PROTOTYPE






























































































   24   25   26   27   28