PROJECT NAME : يبرحلا ريبوج ةزيزع لايف WALL MOUNTED PANEL : IP-65
(3*185+95)+95mm
DISTRIBUTION BOARD NAME : MDB 2 INCOMMING FEEDER : CABLE (3*185+95)+95mm
MAIN INCOMING CIRCUIT BREAKER : 3PH MCCB C.B 400 AMP. CU/XLPE/PVC
SHORT CIRCUIT BREAKING CAPACITY 25KA COPPER CONDUCTORS
GROUND FLOOR
C.B WIRE LOAD/PHASE IN VA ADDED NO C.B PHASE C.B NO ADDED LOAD/PHASE IN VA WIRE C.B
OF CONNECTION OF LOAD DESCRIPTION
NO. SIZE,CU R Y B UNITS RATING RATING UNITS R Y B SIZE,CU NO.
MM2 POLES AMP. R Y B AMP. POLES MM2
1 6683 5247 2
CABLE CABLE
3 DB-FIRST 1 LOAD (3*16+16)+16m 7497 3P 40A 40A 3P 3680 (3*16+16)+16m LOAD DB-FIRST 2 4
m m
5 4393 6325 6
7 16171 16171 8
CABLE CABLE
9 DB-SECOND 1 LOAD (3*35+16)+16m 15219 3P 100A 100A 3P 15219 (3*35+16)+16m LOAD DB-SECOND 2 10
m m
11 15480 15480 12
19 14
15 SPARE 3P 3P SPARE 16
17 18
22854 22716 19873 R Y B 21418 18899 21805
MAIN C.B 22854 22716 19873
250 A 44272 41615 41678
MCCB TOTAL 127565
NOTES :- 25KA
CT : CONTACTOR WITH TIMER & P.B Ics=100% Icu FULL LOAD AMP/PH DEMAND LOAD KVA/PH MAX. DEMAND AMP
CTT : CONTACTOR WITH TIMER & PHOTO CELL R Y B R Y B 43.38
ELR : EARTH LEAKAGE 30 mA 201.24 189.16 189.45 9.54 8.94 8.57
MAX. FULL LOAD AMP DEMAND AMP/PH
201.24 AMP 43.38 40.64 38.97
CONNECTED LOAD LIGHTING SOCKET P/SOCKET AIR CONDITION F.C.U WATER HEATER OTHERS TOTAL
LOAD IN VA 0 0 0 0 0 0 127565 127565
DEMAND FACTOR 0.8 0.9 0.9 0.85 0.8 0.5 0.9 0.90 MDB2
ACTUAL LOAD 0 0 0 0 0 0 114808.5 114808.5 PANEL