Page 38 - Med Plaza and Cancer Center
P. 38
ZONE VALVE/ AREA ALARM / OUTLET PERFORMANCE/GAS CONCENTRATION AND PURITY INSPECTION DOCUMENT
Facility Florida Hospital Orlando-Med Plaza Inspector Steve Gourley
City/State Orlando, FL Date 11-30-17 Page 1 of 2
Contractor n/a Facility Contact Darrell Huckaby
Area Served PACU Beds 1-5 Floor/Bldg 1 Floor Med Plaza
st
Zone Valve Location for this Area Inside area served ZVB Manufacturer Hill-Rom
FL Hosp. Tag # O2/MA/VA-P-5PS-01-B-Z-W-03 #000000227013
Location IAW NFPA 99 Pass Labeled Fails Gauges Pass Leak Test Pass
Test Gauge O2 52 AIR 49 VAC 25
Pressure vs.
ZVB Gauge 53 50 25
Valve Size 3/4 3/4 11/4
Comments: Tags on piping in ZVB read Pre-OP/Discharge Beds 1-5, Should read PACU Beds 1 thru 5
Gas/Pipeline Purity Oxygen Med Air Comments
Hydrocarbons <1 PPM <1 PPM
Dew Point -46 23
Carbon Monoxide <1 PPM <1 PPM
Carbon Dioxide <1 PPM 370 PPM
Gas Concentration 99.9%O2 21.0 (%O2)
Particulates <1 <1
Odor/Discoloration None None
Test Location PACU 4 PACU 4
Area Alarm Panel Location for this Area In PACU nurses station
Location IAW NFPA 99 Pass Labeled Pass Gauges Pass Leak Test Pass
Area Alarm Panel Manufacture Data Hill-Rom (GP-L-5PS-01-3G-003)
GAUGE LOW HIGH TEST
GAS/VAC PSI ALARM ALARM VISUAL AUDIBLE SWITCH SENSOR COMMENTS PASS/FAIL
OXY 52 40 60 P P P PS PASS
AIR 50 40 60 P P P PS PASS
VAC 20 12 - P P P PS PASS
PS= Patient Side SS= Source Side NW= Not Working CNT= Could Not Test NA = Not Applicable NP = Not Present
Corporate Office ∙ 4518 Clements Rd. Lakeland Florida 33811 Phone: 863-646-7555 ∙ Fax 863-646-2999
“Medical Gas Pipeline Equipment Service, Sales & Verifications”
©Daniel Voight 2009