Theory of Operation
                                                                                                 Chapter 3
                When a frontbody barrel is inserted into a rough-in assembly, the secondary check unit is
                forced open, which permits gas flow through the secondary check unit. A rubber bushing
                seals the barrel, preventing external leaks.

                The primary check unit in the frontbody assembly prevents gas flow out of the outlet until
                an appropriate gas-specific adapter is fully inserted and engaged in the frontbody assembly.

                When a DISS (female) adapter is connected onto the frontbody threaded DISS (male)
                barrel, the nose of the DISS adapter pushes the frontbody piston back. This breaks the seal
                between the frontbody barrel and the frontbody O-ring, which allows gas to flow.