Page 51 - SuDS Design & Evaluation Guide-Newham V4 Spreads
P. 51

Concept Design  7.4.13  Flow rate calculations   Approach 2 is simpler but usually results in   approach 1  approach 2  Concept Design

 The aim of controlling flow from a
 development, whether it has been previously
 larger storage volumes than Approach 1.
 developed or not, is to restrict outflow rates
                                                                            inflow
                           inflow
 An allowance for climate change, and in
 to pre-existing ‘greenfield runoff rates’.
 certain situations urban creep, should be
                            rainfall
                                                                             rainfall
 included in hydraulic calculations.
 There are two approaches to controlling
                                                                                 x
                                 x
 outflow rates: Approach 1, as set out in the
 An online tool for estimating Greenfield
 NSTS (non-statutory technical standards)
 runoff rates can be found at www.uksuds.
 requiring additional volume management,
 com or calculated using the methodology in   area                             area
 and Approach 2, the current practice   the SuDS Manual 2015. The uksuds.com
 commonly called the Qbar method.
 calculator is  based on regional geological
 Approach 1 – (NSTS S2 and S4), where the   mapping which can be unrepresentative of   interception losses  interception losses
 volume of runoff is managed to Greenfield   actual site conditions.  Inputs to the
 volume, the allowable discharge rate is   Greenfield runoff calculation should rely upon
 permitted to vary between the  1 in 1 year and   actual soil types for the site rather than   other
 1 in 100 year Greenfield runoff rates for the   regional geological maps.  attenuation   long   attenuation
 respective rainfall return periods.
 In Approach 1 the ‘greenfield runoff rate’ will   storage  term           storage
 Approach 2 – (NSTS S6), where additional   increase with increasing storm return periods.   losses
 runoff volumes cannot be managed on site,   The flow control mechanism will need to   variable outflow   outflow for 1in100 yr
                                               2L
 runoff rates must be further restricted to   account for this increase in flow rate.  from 1in1 to 1in100yr   /sec  rainfall event limited
 45   ensure that there is no increase in flood risk   greenfield runoff   /ha        to 2yr greenfield            46
                                                                                         runoff rate
                     rates
 elsewhere. The general approach that is   In Approach 2 the Qbar value for a site will
 only be achieved for the site or sub-
 adopted is to limit the maximum outflow rate
 catchment when the storage feature is full.
 to Qbar (approximately equivalent to 1 in 2   Most of the time the flow rate is less until a
 year greenfield rate) for all rainfall return
 full storage head is generated.
 periods up to the 1 in 100 year rainfall event   Approach 1 and Approach 2 - Discharge Requirements
 depending on the local soil type.


                                     1 in 1 year rainfall   1 in 100 year   Long term
                                        (maximum             rainfall        storage-
                                       outflow rate)       (maximum           volume
                                                         outflow rate)        control
                     Approach 1          1 in 1 year      1 in 100 year         Yes

                                      greenfield rate      greenfield
                                                              rate
 See Climate Change Allowance (CCA)
                     Approach 2        Qbar/ Qmed         Qbar/ Qmed            No
 Section 9.5.4.6
 and Urban Creep Section 9.5.4.7




 Newham Council SuDS D & E Guide                                                                        © 2020 McCloy Consulting & Robert Bray Associates  Newham Council SuDS D & E Guide                                                                        © 2020 McCloy Consulting & Robert Bray Associates
   46   47   48   49   50   51   52   53   54   55   56