ASSEMBLY SYSTEM TEMPORARY ACCESS PLATFORM INTO THE SHAFT
USER MANUAL V01 SEPTEMBER 2019
6. INDEX TASKS TO BE DONE AT THE INSTALLATION OF PAT
800/2200
OPERATING DEPLOYMENT
1. Remember that the PAT can be broken down into three components to
lighten weight for transport, especially to climb it up the stairs of the
building. It is recommended to decompose the PAT into at least two bodies
for transport, eliminating the hinge pins. On the one hand the fixed ladder,
and on the other the horizontal platform with or without the trays.
2. In all cases, it is advisable to handle the clamping knobs and the pins of
the PAT one by one. In all cases, replace once the regulation has been
carried out to avoid accumulating in the hands several elements that can
cause them to fall or lose them.
3. Before inserting the PAT into the gap, deactivate the transport pins