Page 19 - USER MANUAL UK
P. 19

(PAT 800/2200)



                ASSEMBLY SYSTEM  TEMPORARY ACCESS PLATFORM INTO THE SHAFT

                                    USER MANUAL V01 SEPTEMBER 2019

                     4.  In a vertical position, release the secondary pins of the hinges “1”,
                        slightly unfold the platform and lay the platform aside.


























                     5.  Disassemble both trays by putting the moths back into position.
                     6.  Take depth measurements of the shaft, and ensure the ideal state of the
                        floor slab in front of doors where the base of the platform will rest.
                         Unfold  the  platform  on  the  landing  adjusting  to  hollow  depth
                         measurements + 200 mm. In this way, after supporting the PAT on the
                         bottom wall, it will finally have a positive inclination on the horizontal.
                         Height adjustment through the stairs. Be sure to reinstall the stock with
                         its corresponding handle.


















                         Horizontal adjustment “3” of the platforms and “4” of the support shoes
                         on the bottom wall.











                                                         18
                                                                                                                                       Rev 01               02/05/2019
   14   15   16   17   18   19   20   21   22   23   24