Page 39 - 2018_IFC
P. 39

SCOPE AND ADMINISTRATION



           area safe. The holder of a conditional permit shall proceed  [A] 105.4.1.1 Examination of  documents. The  fire
           only to the point for which approval has been given, at the  code official shall examine or cause to be examined the
           permit holder’s  own  risk and without assurance that   accompanying construction documents and shall ascer-
           approval for the occupancy or the utilization of the entire  tain by such examinations whether the work indicated
           premises, equipment or operations will be granted.      and described is in accordance with the requirements of
                                                                   this code.
           [A] 105.3.5 Posting the permit. Issued permits shall be
           kept on the premises designated therein at all times and  [A] 105.4.2  Information on  construction documents.
           shall be readily available for inspection by the fire code  Construction documents shall be drawn to scale on suit-
           official.                                             able material. Electronic media documents are allowed to
           [A] 105.3.6 Compliance with code. The  issuance or    be submitted where  approved by the  fire code official.
           granting of a permit shall not be construed to be a permit  Construction documents shall  be  of sufficient clarity to
           for, or an approval of, any violation of any of the provi-  indicate the location, nature and extent of the work pro-
           sions of this code or of any other ordinance of the jurisdic-  posed and show in detail that it will conform to the provi-
           tion. Permits presuming to  give authority  to  violate or  sions of this code and relevant laws, ordinances, rules and
           cancel the provisions of this code or other ordinances of  regulations as determined by the fire code official.
           the jurisdiction shall not be valid. The issuance of a permit  [A] 105.4.2.1 Fire protection system shop drawings.
           based on construction documents and other data shall not  Shop drawings for the fire protection system(s) shall be
           prevent the fire code official from requiring the correction  submitted to indicate compliance with this code and the
           of errors in the  construction documents and other data.  construction documents, and shall be approved prior to
           Any addition  to or alteration  of  approved  construction  the start of installation. Shop drawings shall contain all
           documents shall be approved in advance by the fire code  information as required by  the referenced installation
           official, as evidenced by the issuance of a new or amended  standards in Chapter 9.
           permit.
                                                                 [A] 105.4.3 Applicant responsibility. It shall be  the
           [A] 105.3.7 Information on the permit. The  fire code  responsibility of the applicant to ensure that the construc-
           official shall issue all permits required by this code on an  tion documents include all of the fire protection require-
           approved form furnished  for that purpose. The permit  ments and the shop  drawings are complete and in
           shall  contain a  general  description of the operation or  compliance with the applicable codes and standards.
           occupancy  and its location and any other information
           required by the fire code official. Issued permits shall bear  [A]  105.4.4 Approved documents.  Construction docu-
           the signature of the fire code  official or other  approved  ments approved by the fire code official are approved with
           legal authorization.                                  the intent that such construction documents comply in all
                                                                 respects with this code. Review and approval by the fire
           [A] 105.3.8 Validity of permit. The issuance or granting
           of a permit shall not be construed to be a permit for, or an  code official shall not relieve the applicant of the responsi-
           approval of, any violation of any of the provisions of this  bility of compliance with this code.
           code or of any other ordinances of the jurisdiction. Permits  [A] 105.4.4.1 Phased approval. The fire code official
           presuming to give authority to violate or cancel the provi-  is authorized to issue a permit for the construction of
           sions of this code or other ordinances of the jurisdiction  part of a structure, system or operation before the con-
           shall not be valid. The issuance of a permit based on con-  struction documents for the whole structure, system or
           struction documents,  operational documents and other   operation have been submitted, provided that adequate
           data shall not prevent the fire code official from requiring  information  and detailed statements have been filed
           correction of errors in the documents or other data.    complying with pertinent requirements of  this code.
         [A] 105.4 Construction documents.  Construction docu-     The holder of such permit for parts of a structure, sys-
         ments shall be in accordance with Sections 105.4.1 through  tem or operation shall proceed at the holder’s own risk
         105.4.6.                                                  with the building operation and without assurance that
                                                                   a permit for the entire structure, system or operation
           [A] 105.4.1 Submittals. Construction documents and sup-  will be granted.
           porting data shall be submitted in two or more sets with
           each application for a permit and in such form and detail  [A]  105.4.5 Amended construction documents. Work
           as required by the fire code official. The construction doc-  shall be installed in accordance with the  approved con-
           uments shall be prepared by a  registered  design  profes-  struction documents, and any changes made during con-
           sional where required by the statutes of the jurisdiction in  struction that are not in compliance with the  approved
           which the project is to be constructed.               construction documents shall be resubmitted for approval
                                                                 as an amended set of construction documents.
              Exception: The fire code official is authorized to waive
              the submission of construction documents and support-  [A] 105.4.6 Retention of construction documents. One
              ing data not required to  be  prepared  by a  registered  set of construction documents shall be retained by the fire
              design professional if it is found that the nature of the  code official for a period of not less than 180 days from
              work applied  for is such that  review  of  construction  date of completion of the permitted work, or as required
              documents is not necessary to obtain compliance with  by state or local laws. One set of approved construction
              this code.                                         documents shall be returned to the applicant, and said set

         6                                                                          2018 INTERNATIONAL FIRE CODE ®
  Copyrighted © 2017 by, or licensed to, ICC (ALL RIGHTS RESERVED); licensed to UL, LLC pursuant to License Agreement with ICC. No further reproductions authorized or distribution authorized.
  ANY UNAUTHROIZED REPRODUCTION OR DISTRIBUTION IS A VIOLATION OF THE FEDERAL COPYRIGHT ACT AND THE LICENSE AGREEMENT; AND SUBJECT TO CIVIL AND CRIMINAL PENALTIES THEREUNDER.
   34   35   36   37   38   39   40   41   42   43   44