Page 278 - ICC IEBC 2018
P. 278

RESOURCE A



                                                        TABLE 3.1—continued
                                          FLOOR/CEILING ASSEMBLIES—REINFORCED CONCRETE
                                                                  PERFORMANCE      REFERENCE NUMBER
                         ASSEMBLY                                                                              REC.
               ITEM CODE                 CONSTRUCTION DETAILS                                           NOTES
                         THICKNESS                                                                            HOURS
                                                                   LOAD  TIME  PRE-BMS-92 BMS-92 POST-BMS-92
                                  4″ deep (2380 psi) concrete deck;
                                       1
                                  3″ × 1 / ″ × 4 lbs. R.S.J.; 2′6″ C.R.S.; flush
                                        2
              F/C-4-RC-12   4″    with top surface; 4″ × 6″ x 13 SWG mesh  150 psf  1 hr.          7     1, 2   1
                                                                         3 min.
                                  reinforcement 1″ from  bottom surface;
                                  6′6″ span restrained.
                                   1
                                                       1
                                  4 / ″ thick (5200 psi) deck;  / ″ reinforce-
                                    2
                                                        4
                                  ment bars at 7 / ″ pitch with  / ″ cover;  / ″
                                                       7
                                             1
                                                               3
                                              4
                                                                8
                                                        8
                                                       3
                             1
              F/C-4-RC-13   4 / ″  main reinforcement bars at 3 / ″ pitch per- 140 psf 2 hrs.          7  1, 3  2
                              2                         4
                                                1
                                  pendicular with  / ″ cover; 13′1″ span
                                                 2
                                  restrained.
                                  4 / ″ deep (2525 psi)  concrete  deck;  / ″
                                   1
                                                               1
                                                                4
                                    2
                                  reinforcement bars at 7 / ″ pitch with  / ″
                                                    1
                                                               7
                                                                8
                                                     2
                                       3
                             1
                                                               3
              F/C-4-RC-14   4 / ″  cover;  / ″ main reinforcement bars at 3 / ″ 150 psf 42 min.          7  1, 5  2 /
                              2         8                       8                                                3
                                  pitch perpendicular with  / ″ cover; 13′1″
                                                     1
                                                      2
                                  span restrained.
                                  4 / ″ deep (4830 psi) concrete deck;
                                   1
                                    2
                                   1
                                                           3
                                  1 / ″  × No. 15 gauge wire mesh;  / ″ rein-
                                    2                       8
                                                                                                                1
                             1
              F/C-4-RC-15   4 / ″  forcement bars at 15″ pitch with 1″ cover;   75 psf  1 hr.          7  1, 8  1 / 2
                              2
                                  1
                                   / ″  main  reinforcement bars at 6″ pitch
                                   2                                    32 min.
                                                  1
                                  perpendicular with  / ″ cover; 12′  span
                                                   2
                                  simply supported.
                                  4 / ″ deep (4595 psi)  concrete  deck;  / ″
                                                               1
                                   1
                                    2
                                                                4
                                  reinforcement bars at 7 / ″ pitch with  / ″
                                                    1
                                                               7
                                                     2
                                                                8
                                       3
                             1
                                                               1
                                                                                                                1
              F/C-4-RC-16   4 / ″  cover;  / ″ main reinforcement bars at 3 / ″ 75 psf  1 hr.          7  1, 8  1 /
                              2         8                       2       20 min.                                  3
                                  pitch perpendicular  with  / ″ cover; 12′
                                                      1
                                                       2
                                  span simply supported.
                                  4 / ″ deep (3625 psi)  concrete  deck;  / ″
                                   1
                                                               1
                                    2
                                                                4
                                  reinforcement bars at 7 / ″ pitch with  / ″
                                                               7
                                                    1
                                                                8
                                                     2
                                       3
                             1
                                                               1
              F/C-4-RC-17   4 / ″  cover;  / ″ main reinforcement bars at 3 / ″ 75 psf 35 min.          7  1, 8  1 /
                              2         8                       2                                                2
                                  pitch perpendicular  with  / ″ cover; 12′
                                                      1
                                                       2
                                  span simply supported.
                                  4 / ″ deep (4410 psi)  concrete  deck;  / ″
                                   1
                                                               1
                                    2
                                                                4
                                  reinforcement bars at 7 / ″ pitch with  / ″
                                                    1
                                                               7
                                                                8
                                                     2
                                       3
                                                                                                                1
                             1
                                                               1
              F/C-4-RC-18   4 / ″  cover;  / ″ main reinforcement bars at 3 / ″ 85 psf  1 hr.          7  1, 8  1 /
                              2         8                       2       27 min.                                  3
                                  pitch perpendicular  with  / ″ cover; 12′
                                                      1
                                                       2
                                  span simply supported.
                                                       3
                                   1
                                  4 / ″ deep (4850 psi) deck;  / ″ reinforce-
                                    2
                                                        8
                                  ment bars at 15″ pitch with 1″ cover;  / ″
                                                               1
                                                                2
                                                                                                                1
                             1
              F/C-4-RC-19   4 / ″  main reinforcement bars at  6″ pitch per- 75 psf  2 hrs.          7   1, 9  1 /
                              2                                         15 min.                                  4
                                              1
                                  pendicular with  / ″ cover; 12′ span simply
                                               2
                                  supported.
                                   1
                                                       1
                                  4 / ″ deep (3610 psi) deck;  / ″ reinforce-
                                    2
                                                        4
                                  ment bars at 7 / ″ pitch with  / ″ cover;  / ″
                                                       7
                                             1
                                                               3
                                                        8
                                                                8
                                              2
                                                                                                                1
                             1
                                                       1
              F/C-4-RC-20   4 / ″  main reinforcement bars at 3 / ″ pitch per- 75 psf  1 hr.          7  1, 8  1 /
                              2                         2               22 min.                                  3
                                              1
                                  pendicular with  / ″ cover; 12′ span simply
                                               2
                                  supported.
                                                            (continued)
             2018 INTERNATIONAL EXISTING BUILDING CODE ®                                                         259
  Copyrighted © 2017 by, or licensed to, ICC (ALL RIGHTS RESERVED); licensed to UL, LLC pursuant to License Agreement with ICC. No further reproductions authorized or distribution authorized.
  ANY UNAUTHROIZED REPRODUCTION OR DISTRIBUTION IS A VIOLATION OF THE FEDERAL COPYRIGHT ACT AND THE LICENSE AGREEMENT; AND SUBJECT TO CIVIL AND CRIMINAL PENALTIES THEREUNDER.
   273   274   275   276   277   278   279   280   281   282   283