RESOURCE A



                                                            FIGURE 3.4
                               FLOOR/CEILING ASSEMBLIES—HOLLOW CLAY TILE WITH REINFORCED CONCRETE

              NUMBER OF
              ASSEMBLIES

                10





                                                                                         The number in each box is
                                                                                         keyed to the last number in the
                                                                                         Item Code column in the Table.
                                                                                         For example:
                                                                                                  F/C-HT-2
                 5





                                                             13

                                       11                    5        9

                                       10           12       3    1   4   7                 2        8   6
                 0
                   0                     1                     2                      3                     4
                                                FIRE RESISTANCE RATING (HOURS)


                                                            TABLE 3.4
                               FLOOR/CEILING ASSEMBLIES—HOLLOW CLAY TILE WITH REINFORCED CONCRETE
                ITEM  ASSEMBLY                                     PERFORMANCE     REFERENCE NUMBER            REC.
               CODE   THICKNESS        CONSTRUCTION DETAILS        LOAD  TIME  PRE-BMS-92 BMS-92 POST-BMS-92  NOTES  HOURS
                                     1
                               Cover: 1 / ″ concrete (6080 psi); three cell hol-
                                      2
                                                        1
                                                         4
             F/C-HT-1    6″    low clay tiles, 12″ ×  12″ ×  4″; 3 / ″ concrete   75 psf  2 hrs.  7     1,  2,  3  2
                               between tiles including two  / ″ rebars with  / ″  7 min.
                                                               3
                                                    1
                                                     2
                                                                4
                                          1
                               concrete cover;  / ″ plaster cover, lower.
                                            2
                                     1
                               Cover: 1 / ″ concrete (5840 psi); three cell hol-
                                      2
                                                        1
                               low clay tiles, 12″ ×  12″ ×  4″; 3 / ″ concrete   3 hrs.
                                                         4
                                                                                                                1
                                                     1
             F/C-HT-2    6″    between tiles including two  / ″ rebars each  61 psf  23 min.      7     3,  4,  6  3 / 3
                                                       2
                                                       5
                                   1
                               with  / ″  concrete cover and  / ″ filler  tiles
                                    2
                                                        8
                                               1
                               between hollow tiles;  / ″ plaster cover, lower.
                                                2
                                     1
                               Cover: 1 / ″ concrete (6280 psi); three cell hol-
                                      2
                                                        1
                                                         4
             F/C-HT-3    6″    low clay tiles, 12″ ×  12″ ×  4″; 3 / ″ concrete   122   2 hrs.          7  1, 3, 5,  2
                               between tiles including two  / ″ rebars with  / ″  psf                     8
                                                               1
                                                    1
                                                     2
                                                                2
                                    1
                               cover;  / ″ plaster cover, lower.
                                     2
                                     1
                               Cover: 1 / ″ concrete (6280 psi); three cell hol-
                                      2
                                                        1
                                                                                                                1
                                                         4
             F/C-HT-4    6″    low clay tiles, 12″ ×  12″ ×  4″; 3 / ″ concrete   115   2 hrs.    7     1,  3,  7  2 /
                               between tiles including two  / ″ rebars with  / ″  psf  23 min.                   3
                                                               3
                                                    1
                                                     2
                                                                4
                                    1
                               cover;  / ″ plaster cover, lower.
                                     2
                                     1
                               Cover: 1 / ″ concrete (6470 psi); three cell hol-
                                      2
                                                        1
                                                         4
             F/C-HT-5    6″    low clay tiles, 12″ ×  12″ ×  4″; 3 / ″ concrete   122   2 hrs.          7  1, 3, 5,  2
                               between tiles including two  / ″ rebars with  / ″  psf                     8
                                                    1
                                                               1
                                                     2
                                                                2
                                    1
                               cover;  / ″ plaster cover, lower.
                                     2
                                                            (continued)
             2018 INTERNATIONAL EXISTING BUILDING CODE ®                                                         273
  Copyrighted © 2017 by, or licensed to, ICC (ALL RIGHTS RESERVED); licensed to UL, LLC pursuant to License Agreement with ICC. No further reproductions authorized or distribution authorized.
  ANY UNAUTHROIZED REPRODUCTION OR DISTRIBUTION IS A VIOLATION OF THE FEDERAL COPYRIGHT ACT AND THE LICENSE AGREEMENT; AND SUBJECT TO CIVIL AND CRIMINAL PENALTIES THEREUNDER.
   287   288   289   290   291   292   293   294   295   296   297