Page 11 - fkppc book-1
P. 11
LAMPIRAN FKPPC2 - 4
HARGA PATOKAN DASAR OVER VB PERUMAHAN CIJANTUNG II
PBB ONLINE MULAI 1993 - 2017
Rumah Type G
NOMOR OBJEK PAJAK 3.17201E+17 317201000502000440 3.17201E+17 3.17201E+17 3.17201E+17
3.17201E+17
TAHUN PAJAK 2012 2011 2010 2009 2008
NJOP BUMI/ M2 1,573,000 1,573,000 1,416,000 1,274,000 1,032,000
NJOP BANG./ M2 1,200,000 1,200,000 1,200,000 1,200,000 968,000
NJOP BUMI BERSAMA/ M2 0 0 0 0 0
NJOP BANG. BERSAMA/ M2 0 0 0 0 0
TOTAL NJOP 869,200,000 869,200,000 806,400,000 749,600,000 606,400,000
NJOPTKP 12,000,000 12,000,000 12,000,000 12,000,000 12,000,000
NJOP 869,200,000 869,200,000 806,400,000 749,600,000 606,400,000
NJKP (%) 20 20 20 20 20
NJKP 171,440,000 171,440,000 158,880,000 147,520,000 118,880,000
TARIF (%) .5 .5 .5 .5 .5
PBB YG HARUS DIBAYAR SPPT 857,200 857,200 794,400 737,600 594,400
TGL JATUH TEMPO SPPT 4/28/2017 4/28/2017 4/28/2017 4/28/2017 4/28/2017
STATUS LUNAS LUNAS LUNAS BELUM LUNAS LUNAS
Harga Over VB menurut Tahun
MINIMUM 869,200,000 869,200,000 806,400,000 749,600,000 606,400,000
NEGOSIASI 1,303,800,000 1,303,800,000 1,209,600,000 1,124,400,000 909,600,000
MAKSIMUM 1,738,400,000 1,738,400,000 1,612,800,000 1,499,200,000 1,212,800,000