Page 13 - fkppc book-1
P. 13
LAMPIRAN FKPPC2 - 4
HARGA PATOKAN DASAR OVER VB PERUMAHAN CIJANTUNG II
PBB ONLINE MULAI 1993 - 2017
Rumah Type G
NOMOR OBJEK PAJAK 3.17201E+17 317201000502000440 3.17201E+17 3.17201E+17 3.17201E+17
3.17201E+17
TAHUN PAJAK 2002 2001 2000 1999 1998
NJOP BUMI/ M2 285,000 285,000 285,000 285,000 285,000
NJOP BANG./ M2 429,000 429,000 429,000 429,000 429,000
NJOP BUMI BERSAMA/ M2 0 0 0 0 0
NJOP BANG. BERSAMA/ M2 0 0 0 0 0
TOTAL NJOP 199,800,000 199,800,000 199,800,000 199,800,000 199,800,000
NJOPTKP 10,000,000 10,000,000 8,000,000 0 0
NJOP 199,800,000 199,800,000 199,800,000 199,800,000 199,800,000
NJKP (%) 20 20 20 20 20
NJKP 37,960,000 37,960,000 38,360,000 39,960,000 39,960,000
TARIF (%) .5 .5 .5 .5 .5
PBB YG HARUS DIBAYAR SPPT 189,800 189,800 191,800 191,800 191,800
TGL JATUH TEMPO SPPT 4/28/2017 4/28/2017 4/28/2017 4/28/2017 4/28/2017
STATUS LUNAS BELUM LUNAS LUNAS LUNAS LUNAS
Harga Over VB menurut Tahun
MINIMUM 199,800,000 199,800,000 199,800,000 199,800,000 199,800,000
NEGOSIASI 299,700,000 299,700,000 299,700,000 299,700,000 299,700,000
MAKSIMUM 399,600,000 399,600,000 399,600,000 399,600,000 399,600,000