Make barcode reading much more easier
Quality Control
QA organization Quality in Manufacturing phase
QA
Manager
→ → →
Receving IQC W/H Assembly
QA QC → →
Section Manager Section Manager
→ Inspection
IPQC Complete
QE SQE IQC IPQC OQC → → →
Shipping → F/G Stock → OQC Packing
QA Department: New Product verification (MVT), Engineering Change verification,
Customer Complaint analysis, ORT implement, Equipment maintenance.
QC Department:
● SQE: New supplier Survey, QVL management, Nonconformity handling. Quality in Service Phase
● IQC: Incoming INSP, CAR management.
● OQC: F/G INSP, Nonconformity handling, Quality System management. FAE and RMA Services
● IPQC: Production inspection, 5S Supervise the implementation.
Quality in Design phase Technical
Support Engineers
? 0K
Phase Out Stage
Engineering Design Stage
Project Review Report,
Confirmation of product engineering → Pre/Post-sales →
specification, Pre BOM, Configuration Manufacturing Validation Stage Preliminary Material Pairing Tech-Support
list, Pre schematics, PCB outline Request,Preliminary Material
drawing, Software specification, SOP/SIP, Manufacture/Test equipment list, Pairing Report, Material Pairing
Hardware specification, Trial run report, Time standard, Request, Material Pairing Report,
Critical parts list & data sheet, C4 Test report, Marketing Resource Modification,
Market survey/plan Stage Make the prototype Environmental investigation report, Sales Termination Notice, Material Customer Oriented Service
of the project and evaluate the Manual, Quotation of manufacture cost. Disposal Report, Relative Asset Satisfaction
Market requirement prototype,C3 test plan, Report, Document Handling Report. Repair Service
specification Output, Forecast for C4 and C5, Specialists
Requirement of New Quotation of manufacture cost.
Version
C0 C1 C2/EVT C3/DVT C4/MVT C5/MP C6
Global Quality Certification
Product Concept Stage Design Validation Stage Mass Production Stage
Confirmation of Time schedule, Software source code, BOM, Yield rate analysis report or
Project team, Key component Schematics,PCB artwork drawing, Production report,
specification, Model number define, Hazardous substance(HS) Parts List, Final SOP/SIP. The quality management system: ISO 9001:2015
ID Drawing Package design, C3 test report, Packing
specification file, EMI evaluation report,
Safety evaluation report, Project transfer
seminar, C4 test plan, R&D bug history,
Assembly drawing, Manual, Quotation of
manufacture cost.