Page 35 - GODEX &WILSON
P. 35

Make barcode reading   much more easier






 Quality Control


 QA organization  Quality in Manufacturing phase

      QA
 Manager
                           →             →              →
                 Receving         IQC           W/H          Assembly

            QA              QC                                     →  →
 Section Manager   Section Manager
                                                                      →     Inspection
                                                               IPQC          Complete
 QE   SQE   IQC   IPQC   OQC                                   → →      →
                  Shipping    →  F/G Stock   →  OQC          Packing

 QA Department: New Product verification (MVT), Engineering Change verification,
 Customer Complaint analysis, ORT implement, Equipment maintenance.
 QC Department:
 ● SQE: New supplier Survey, QVL management, Nonconformity handling.   Quality in Service Phase
 ● IQC: Incoming INSP, CAR management.
 ● OQC: F/G INSP, Nonconformity handling, Quality System management.  FAE and RMA Services
 ● IPQC: Production inspection, 5S Supervise the implementation.
 Quality in Design phase                          Technical
                                                  Support Engineers
                     ?                                                          0K
 Phase Out Stage
 Engineering Design Stage
 Project Review Report,
 Confirmation of product engineering  →            Pre/Post-sales   →
 specification, Pre BOM, Configuration  Manufacturing Validation Stage  Preliminary Material Pairing  Tech-Support
 list, Pre schematics, PCB outline   Request,Preliminary Material
 drawing, Software specification,  SOP/SIP, Manufacture/Test equipment list,   Pairing Report, Material Pairing
 Hardware specification,   Trial run report, Time standard,  Request, Material Pairing Report,
 Critical parts list & data sheet,   C4 Test report,   Marketing Resource Modification,
 Market survey/plan Stage  Make the prototype  Environmental investigation report,   Sales Termination Notice, Material  Customer Oriented Service
 of the project and evaluate the   Manual, Quotation of manufacture cost.  Disposal Report, Relative Asset   Satisfaction
 Market requirement   prototype,C3 test plan,  Report, Document Handling Report.   Repair Service
 specification Output,   Forecast for C4 and C5,   Specialists
 Requirement of New   Quotation of manufacture cost.
 Version
 C0  C1  C2/EVT  C3/DVT  C4/MVT  C5/MP  C6
        Global Quality Certification
 Product Concept Stage  Design Validation Stage  Mass Production Stage
 Confirmation of Time schedule,  Software source code, BOM,   Yield rate analysis report or
 Project team, Key component   Schematics,PCB artwork drawing,   Production report,
 specification, Model number define,   Hazardous substance(HS) Parts List,   Final SOP/SIP.  The quality management system: ISO 9001:2015
 ID Drawing  Package design, C3 test report, Packing
 specification file, EMI evaluation report,
 Safety evaluation report, Project transfer
 seminar, C4 test plan, R&D bug history,
 Assembly drawing, Manual, Quotation of
 manufacture cost.
                                                                                ISO 9001:2015


 07                                                                                        08
   30   31   32   33   34   35   36   37   38   39   40