Case study I
                              Project background
                              Project background



                               The Charoen Pokphand Foods (CPF) building is the main
                              office building The building consists of a 3 storey , The
                              original live loads used to design the floor ranged from
                              2.5 to 4.0 kN/m2, whereas the new superimposed loads
                              demand  on the 1st floor increased by  up  to  150%  (6
                              kN/m2). For superimposed loads from machines animal
                              food production.









                                                          The Charoen Pokphand Foods (CPF) building,
                                                              Samutsakorn province, Thailand











         Case study I
                           Visual inspection
                           Visual inspection