Page 6 - CFS eBrochure
P. 6

Refractory Inspection & Consulting



                   •  Design, Project Specifications and Execution Plan

                   •  Installation and Dry-out Procedures


                   •  API 936 refractory inspection

                   •  Refractory lining evaluation and repair recommendations

                   •  Assessment of equipment while in operation

                   •  Refractory training

                   •  Failure Analysis

                   •  Ceramic fiber blanket, castable materials and brick lining systems

                   •  FCC, SRU, Acid Gas, Boilers, Thermal Oxidizers, Heaters, Ethylene
                       Furnaces, Cokers, Calciners





















               Refractory Laboratory Testing Services


                   •  Material pre-qualification

                   •  Installer qualification

                   •  Production, or as-installed testing

                   •  Failure analysis testing





                                                        580.762.4510
                                                   www.cfsinspection.com
   1   2   3   4   5   6   7   8   9   10   11