Eastern Connecticut State University

                                         Fine and Performing Arts Center, Willimantic, CT





















         SIZE                                CONSTRUCTION COST ESTIMATES
         118,000 square feet                 DD $61.8M
                                             50% CD $62.5M
         CONTRACT TYPE                       100% CD $64M
         Construction Manager-at-Risk
                                             ACTUAL BID PRICING
         OWNER                               $61.9M
         Eastern Connecticut State University
         (CT DCS project)                    LEED CERTIFICATION
                                             LEED Silver Certifi cation
         REFERENCE
         Ken Fitzgerald, Project Manager (DCS)
         860.713.5926







                                                                  PROJECT DETAILS
        Th  is project consisted of a new 118,000 SF Fine and Performing   •  Connecticut Department of Administrative/Construction
        Arts Center. Th  e Fine Arts Center combined teaching, performance   Services (DAS/DCS) funded project.
        and exhibit spaces for the Performing Arts (Music and Th eatre)
                                                                      •  A high standard of sustainability was met through
        Departments and Visual Arts Department as well as general purpose
                                                                       the use of natural lighting, automatic lighting controls,
        classroom space. Th  e Center includes a 300 seat auditorium, a 100
                                                                       refl ective roofi ng, high performance exterior façade
        seat Proscenium Th  eatre and a fl exible 125 seat Studio/Black Box
                                                                       featuring, energy effi  cient HVAC system including
        Th  eatre that can be arranged in multiple seating confi gurations.
                                                                       heat-recovery system and low fl ow plumbing fi xtures.
                                                                       LEED Silver certifi cation.
        Barr & Barr worked closely with the design team and the third
        party estimating fi rm to help build a realistic and achievable project   •  Building Information Modeling (BIM) will be used
        budget after a major value management eff ort had taken place.  Our   for constructability analysis, 3D MEP Coordination
        estimating team continued to provide reliable and accurate budgets   and clash detection, 4D construction sequencing
        by delivering extremely detailed estimates.                    and schedule analysis, 5D Quantity Extraction,
                                                                       3D logistics and safety planning, virtual mock ups
                                                                       (constructability) and fabrication modeling for curtain
                                                                       wall and structural steel.