                                       Renovations to Buildings E17 and E18, Cambridge, MA





















         SIZE                                CONSTRUCTION COST ESTIMATES
         100,000 square feet                 DD $21.2M

         CONTRACT TYPE                       ACTUAL BID PRICING
         Construction Manager-at-Risk        $21.5M
         OWNER
         Massachusetts Institute of Technology
         REFERENCE
         Jan Burke, Project Manager
         617.258.5463








                                                                  PROJECT DETAILS
        Th  is project consisted of a major renovation of a 100,000 SF of   •   We minimized disruptions for users occupying
        laboratory, administrative and academic building. Signifi cant portions   the building, including an existing vivarium, during
        of Buildings E17 and E18 were vacated due to the opening of the   construction through intense preconstruction
        Koch Institute for Integrative Cancer Research. MIT used that   scheduling.
        opportunity to renovate within the buildings in order to create offi  ce
                                                                      •  Building Information Modeling (BIM) utilized to
        swing space that serves a variety of academic and administrative
                                                                       coordinate MEP/FP systems on the 5th fl oor lab space
        functions and one fl oor of laboratory for the engineering department.
                                                                       - clash detection & coordination between systems and
                                                                       existing conditions.
        Th  e key to Barr & Barr’s estimating success on this project was
        extensive site review and documentation of existing conditions. Th is   •  Precise coordination of mechanical, electrical and
        included exploratory investigative work to encompass existing MEP   plumbing allowed for extensive system upgrades and
        systems and building structure review.                         additions within highly congested spaces.

                                                                      •  Barr & Barr previously converted multiple fl oors
                                                                       within building E18 into educational facilities, clinical
                                                                       research lab space and the headquarters for the MIT
                                                                       Center for Learning and Memory. MIT Center for
                                                                       Cancer Research and a new Mechanical Penthouse.