Page 21 - KUH Refresh Proposal 8.14.17
P. 21

Keith W. Stanisce

                                                       Offi  cer In Charge


         EDUCATION
         West Virginia University
         BS Civil Engineering
         American Society for Healthcare
         Engineering (ASHE)
         Construction Certifi cate

         YEARS OF EXPERIENCE
         34
         YEARS WITH BARR & BARR
         34






        A graduate civil engineer with extensive experience in higher education and the healthcare industry.  Keith, in his 34 years of
        experience, has obtained the trust and confi dence of owners, architects and subcontractors.  Providing him the opportunity to
        work hand–in-hand with some of todays leading Institutions and signature architects.  His leadership, integrity and knowledge
        has promoted him to the position of President and CEO of Barr & Barr.

        SIMILAR PROJECTS

        Community Medical Center, Toms River, NJ               Maimonides Medical Center, Brooklyn, NY
        EMERGENCY DEPARTMENT                                   81,000 SF. The Maimonides Medical Center Major Modernization
        250,000 SF. The phased expansion and renovation consisted  Project consists of the construction of a nine (9) story addition
        of new four-story and two-story additions to the existing  to the present Aaron Building.  The new building also connects
        Emergency Department along with 30,000 square feet of  to the existing Gellman Building.  A new elevator and utility
        renovations to the existing structure. Adjacent to the new  core serves all three (3) buildings. Renovation of the existing
        addition, a new 175 car parking structure was also built which  Aaron building was done along with the new construction.
        ties into the new walk-in entrance.
                                                               RWJ University Hospital, New Brunswick, NJ
        OB EXPANSION                                           308,000 SF. The project includes a nine-story garage capable of
        24,000 SF. The project consisted of a one-story, 24,000 s.f.  holding 650+ cars and a new service vault with new substation
        addition atop the existing 4th fl oor patient wing. A large section  and generators. On top of the garage will be two stories of offi ce
        of the addition was erected directly over the outpatient entrance,  space and a data center. The structure and building systems
        which maintained its daily fl ow. The new fl oor provided an  are designed for additional vertical expansion in the future.
        additional 27 post partum rooms to better serve the needs of
        the growing Community.                                 Clara Maass Medical Center, Belleville, NJ
                                                               247,000 SF (733 spaces).  The multi-level, mixed-use, precast
        SURGICAL SUITE                                         garage alleviates parking shortages and provides a supply
        11,000 SF. Interior renovation consisting of complete demolition  for future demand. About ten percent of the 733 spaces are
        of interior spaces, mechanical/electrical upgrade and all new  allotted for physicians and staff by way of card readers, while
        architectural fi nishes within the functioning surgery suite.     the remaining spaces are earmarked for patients and visitors
                                                               by way of Pay-On-Foot Machines.
        ELEVATOR EXPANSION
        Added two (2) new elevators to the existing lobby.  The  Princeton University, Princeton, NJ
        existing lobby area and elevators remained fully operational  249,000 SF, Pursuing LEED Silver. The state-of-the-art two-
        during construction.                                   building complex houses the Peretsman-Scully Hall & Princeton
                                                               Neuroscience Institute and the Department of Psychology. The
        CANCER CENTER                                          research facilities will feature teaching classrooms, meeting
        18,000 SF.  This multi phased project included interior  rooms, faculty offi ces, laboratories and instructional space.
        renovations to accommodate a new Cancer Center.  All work
        was completed while the existing Cancer Center remained  NY Hospital Queens, Flushing, NY
        fully operational.                                     301,425 SF. The New York Hospital Queens Master Plan Project
                                                               featured a seven-story, 202,000 square foot addition, as well
        PARKING GARAGE                                         as renovations to adjoining areas of the Hospital. The West
        New 175 car parking structure, tying into the new walk-in  Wing Addition includes a new Ambulatory Surgery Center,
        entrance.                                              new main entrance and lobby, Non-Invasive Cardiology Suite,
                                                               two fl oors of Med/Surg beds and Medical Practices offi ces on
                                                               the basement level.