Page 23 - KUH Refresh Proposal 8.14.17
P. 23

John Duncan
                                                       Senior Project Manager


            EDUCATION
            New Jersey Institute of Technology
            BS Mechanical Engineering

            Babson College
            Advanced Leadership Institute
            Virginia Military Institute

            MCCA
            Senior Project Management
            Certifi cation
            YEARS OF EXPERIENCE
            34
            YEARS WITH BARR & BARR
            >2

           John’s 34 years of experience in the industry has developed unmatched experience in high quality construction with in-depth
           scheduling and strict adherence on maintaining safe projects. John’s experience on large scale projects means his planning
           acumen is second to none - his oversight and controls results in projects fi nishing with the highest quality, on schedule and
           within budget.


           SIMILAR PROJECTS

           Rutgers University, Piscataway, NJ                     Novartis Oncology Consolidation, East Hanover, NJ
           145,000 SF. This new four story  (above grade) Chemistry and  310,000 SF. Oncology Consolidation Class A offi ce for all
           Chemical Biology, with a basement and penthouse, will house  non research and manufacturing personnel built in the iconic
           classrooms, administration offi ces, research laboratories and  style of Rafael Vinoly. The building is actually a double helix
           a 120 seat auditorium.  The lobby doubles as a presentation  that resembles a parking garage layout with perimeter areas
           and gathering space and the  basement includes specialty  incorporating an open offi ce design with the interior spaces
           imaging facilities. The structure consists of a concrete wide  having conference rooms and common areas that appear to
           module joist system and includes architecturally exposed  hang between levels.
           concrete at laboratories, stairways and other interior locations.     • 800 open workstations
           The mechanical penthouse has steel framing members. The       • 50 seat cafe
           Exterior Envelop materials include curtainwall, terracotta     • Complete AV/Security/Data installation
           rain screen, composite metal panel, precast and dimension     • Fitness Center
           stone cladding.                                               • Training center with meeting rooms
                                                                         • Building high atrium
           Community Medical Center, Toms River, NJ
           EMERGENCY DEPARTMENT                                   Investment Headquarters and 425 Car Parking Garage
           250,000 SF. The phased expansion and renovation consisted  MetLife, Hanover Township, NJ
           of new four-story and two-story additions to the existing  200,000 SF. This four story offi ce building was constructed on
           Emergency Department along with 30,000 square feet of  an 11 acre site adjacent to our completed Bayer Pharmaceuticals
           renovations to the existing structure. Adjacent to the new  Headquarters facility. This new Headquarters for MetLife
           addition, a new 175 car parking structure was also built which  Investments includes offi ce space, open collaborative work
           ties into the new walk-in entrance.                    spaces, conference rooms, a full serving kitchen and cafeteria.
           PARKING GARAGE                                         This project also includes a 425 car pre-cast parking structure
           New 175 car parking structure, tying into the new walk-in  adjacent to the new building.
           entrance.
                                                                  Capital Health, Trenton, NJ
           RWJ University Hospital, New Brunswick, NJ             107,000 SF. Fuld Campus - Regional Perinatal Center Renovation.
           308,000 SF. The project includes a nine-story garage capable of  Area renovations included Sleep Lab; Escort Services; Partial
           holding 650+ cars and a new service vault with new substation  Hospital (Corporate Health Center); Data Center; 12 Bed Med/
           and generators. On top of the garage will be two stories of offi ce  Surg Unit; 10 Bed Pediatrics; 36 Bed Med/Surg Unit; Maternal
           space and a data center. The structure and building systems  Fetal (Mem); Labor, Delivery, Recovery and Postpartum
           are designed for additional vertical expansion in the future.   (LDRP);and Neo-Natal Intensive Care Unit (NICU) Support.
   18   19   20   21   22   23   24   25   26   27   28