Page 29 - KUH Refresh Proposal 8.14.17
P. 29

Victor Casilla
                                         Parking Garage/Patient Building Assistant Superintendent


            EDUCATION
            ITT Technical Institute, AAS
            in Computer Aided Drafting &
            Design, 2015
            Penn Foster Career School,
            Gunsmithing Diploma, 2012

            U.S. Marine Corps, 2007 - 2011


            YEARS OF EXPERIENCE
            1
            YEARS WITH BARR & BARR
            1




           Victor will coordinate all fi eld activities of the project, directing the work fl ow of the subcontractors under the supervision
           of the Sr. Project Manager and Superintendent.  He will coordinate with all trades to see that all deliverables are in place and
           that high quality work is performed in a timely and professional manner, ensuring the maintenance of construction schedule.


           SIMILAR PROJECTS

           Rutgers University, Piscataway, NJ
           145,000 SF. This new four story  (above grade) Chemistry and
           Chemical Biology, with a basement and penthouse, will house
           classrooms, administration offi ces, research laboratories and
           a 120 seat auditorium.  The lobby doubles as a presentation
           and gathering space and the  basement includes specialty
           imaging facilities. The structure consists of a concrete wide
           module joist system and includes architecturally exposed
           concrete at laboratories, stairways and other interior locations.
           The mechanical penthouse has steel framing members. The
           Exterior Envelop materials include curtainwall, terracotta
           rain screen, composite metal panel, precast and dimension
           stone cladding.
   24   25   26   27   28   29   30   31   32   33   34