Page 59 - KUH Refresh Proposal 8.14.17
P. 59

460 West 34th St., 10th Fl.
 Notes:                                                                                                New York, NY 10001
 Soil                                                                                                  Phone: (212) 563-2330
 - CHECK CLEARANCE HEIGHT OF ALL                                                                        Fax: (212) 967-2297
 Storage                                                                                                www.barrandbarr.com
 EXISTING POWER/TELEDATA LINES ON
 CAMPUS PRIOR TO MOBILIZATION &
 DELIVERIES.
 - MAINTAIN ACCESS TO ADJACENT
 ROADWAYS,DRIVEWAYS & SIDEWALKS.
 - ROADWAYS TO BE
 MAINTAINED/CLEANED THROUGHOUT
 THE DURATION OF THE PROJECT.
 - ALL WORK TO BE COORDINATED WITH
 Construction gate
 OWNER PRIOR TO START.
 w/tracking Pad (Typ.)
 - PPE SIGNAGE TO BE CLEARLY
 POSTED AROUND SITE
 New Drainage Basin

 Exist. Medical Gas Farm

 New Parking Area



 8' Construction fence
 w/privacy screening
                                                                                                   WASHINGTON TOWNSHIP, NJ


 Construction gate                                                                                 KENNEDY
 Existing Utility Relocations
 w/tracking Pad (Typ.)                                                                             UNIVERSITY
                                                                                                   HOSPITAL NEW
                                                                                                   PARKING GARAGE &
                                                                                                   PATIENT TOWER




 Flagman as required
 for deliveries. (Typ)                                                         N








                                                                                                   2          08/21/17              Revised RFP
                                                                                                   1          04/13/17              RFP
                                                                                                   NO.      DATE:                    ISSUED:

                                                                                                   SITE LOGISTICS
                                                                                                   PLAN - Phase 1B
                                                                                                   New Drainage
                                                                                                   Basin & Utilities
 Trucking Route

                                                                                                   SCALE: NTS
                                                                                                   JOB NO:
                                                                                                   DRAWN BY: RG
                                                                                                   CHECKED BY: GO
                                                                                                        SL-03
   54   55   56   57   58   59   60   61   62