Page 61 - KUH Refresh Proposal 8.14.17
P. 61

460 West 34th St., 10th Fl.
 Notes:  Phase 2A                                                                                      New York, NY 10001
                                                                                                       Phone: (212) 563-2330
 - CHECK CLEARANCE HEIGHT OF ALL           Lift Station Relocation                                      Fax: (212) 967-2297
 -O2/Water/Gas Relocate                                                                                 www.barrandbarr.com
 EXISTING POWER/TELEDATA LINES ON
 -New Storm/Sanitary
 CAMPUS PRIOR TO MOBILIZATION &
 DELIVERIES.
 - MAINTAIN ACCESS TO ADJACENT
 ROADWAYS,DRIVEWAYS & SIDEWALKS.
 - ROADWAYS TO BE
 MAINTAINED/CLEANED THROUGHOUT
 THE DURATION OF THE PROJECT.
 - ALL WORK TO BE COORDINATED WITH
 OWNER PRIOR TO START.
 - PPE SIGNAGE TO BE CLEARLY
 POSTED AROUND SITE
         Elevation change in this area
         varies up to 8' from Existing
         Parking grade to New Parking and
 New Parking Area
         F.F. in New Parking Garage



                       Maintain Access to FDC

                                                                                                   WASHINGTON TOWNSHIP, NJ
                       Maintain Pedestrian Egress
                                                                                                   KENNEDY
 New Precast Parking Garage                                                                        UNIVERSITY
 Phase 1C                                                                                          HOSPITAL NEW
                                                                                                   PARKING GARAGE &
 300 ton Crawler - (Based on                                                                       PATIENT TOWER
 Manitowoc 2250)
 1  2  3  4
 8' Construction fence
 w/privacy screening
                                                                               N

 Security Guard
                               New Parking Layout

 Secondary Construction
 gate w/tracking Pad (Typ.)                                                                        2          08/21/17              Revised RFP
 for Emergency Egress                                                                              1          04/13/17              RFP

 Construction gate   Phase 2B                                                                      NO.      DATE:                    ISSUED:
 w/tracking Pad (Typ.)                                                                             SITE LOGISTICS
                                                                                                   PLAN - Phase 1C,
                                                                                                   2A & 2B Parking
                                                                                                   Garage/Site
 Security Guard
 Trucking Route                                                                                    Work
                                     Flagman as required                                           SCALE: NTS
                                     for deliveries. (Typ)                                         JOB NO:
                                                                                                   DRAWN BY: RG
                                                                                                   CHECKED BY: GO
                                                                                                        SL-04