Page 61 - KUH Refresh Proposal 8.14.17
P. 61
460 West 34th St., 10th Fl.
Notes: Phase 2A New York, NY 10001
Phone: (212) 563-2330
- CHECK CLEARANCE HEIGHT OF ALL Lift Station Relocation Fax: (212) 967-2297
-O2/Water/Gas Relocate www.barrandbarr.com
EXISTING POWER/TELEDATA LINES ON
-New Storm/Sanitary
CAMPUS PRIOR TO MOBILIZATION &
DELIVERIES.
- MAINTAIN ACCESS TO ADJACENT
ROADWAYS,DRIVEWAYS & SIDEWALKS.
- ROADWAYS TO BE
MAINTAINED/CLEANED THROUGHOUT
THE DURATION OF THE PROJECT.
- ALL WORK TO BE COORDINATED WITH
OWNER PRIOR TO START.
- PPE SIGNAGE TO BE CLEARLY
POSTED AROUND SITE
Elevation change in this area
varies up to 8' from Existing
Parking grade to New Parking and
New Parking Area
F.F. in New Parking Garage
Maintain Access to FDC
WASHINGTON TOWNSHIP, NJ
Maintain Pedestrian Egress
KENNEDY
New Precast Parking Garage UNIVERSITY
Phase 1C HOSPITAL NEW
PARKING GARAGE &
300 ton Crawler - (Based on PATIENT TOWER
Manitowoc 2250)
1 2 3 4
8' Construction fence
w/privacy screening
N
Security Guard
New Parking Layout
Secondary Construction
gate w/tracking Pad (Typ.) 2 08/21/17 Revised RFP
for Emergency Egress 1 04/13/17 RFP
Construction gate Phase 2B NO. DATE: ISSUED:
w/tracking Pad (Typ.) SITE LOGISTICS
PLAN - Phase 1C,
2A & 2B Parking
Garage/Site
Security Guard
Trucking Route Work
Flagman as required SCALE: NTS
for deliveries. (Typ) JOB NO:
DRAWN BY: RG
CHECKED BY: GO
SL-04