ISO New England

                                          New Corporate Headquarters and Data Center


































          SIZE                     OWNER
          150,000 square feet      ISO New England
          CONTRACT TYPE            ARCHITECT
          Construction Manager-at-Risk  Spagnolo Gisness & Associates







                                                                   PROJECT DETAILS
          Th  is project included the construction of a 90,000-square-foot corporate       •   A high standard of sustainability was met
          headquarters including a new state-of-the-art data center. Th e complete   through the use of 97% construction and
          renovation and repurposing of the existing corporate headquarters and   demolition waste recycled, locally extracted
          60,000-square-foot datacenter was turned into administration offi  ces,   and manufactured materials (within 500 miles),
                                                                           low-VOC building products, bike racks, the
          cafeteria, fi tness, conference rooms and an integrated training center.
                                                                           purchase of renewable energy credits, drought
          We met ISO New England’s need for more space and eliminated the
                                                                           tolerant landscaping and energy effi  cient
          ineffi  ciencies of outdated equipment and two separate campuses.
                                                                           insulation, windows, lighting, heating/air
                                                                           conditioning systems and water heating (38%
                                                                           annual energy cost savings).
                                                                          •   First commercial corporate headquarters in
                                                                           New England to be certifi ed LEED Gold.
                                                                          •   Team-oriented value management reviews
                                                                           conducted during each design phase identifi ed
                                                                           lower-cost design alternatives that maintained
                                                                           both quality and the schedule.

                                                                          •   Operations continued to mission critical
                                                                           facility without interruption 24/7/365 thanks
                                                                           to intense coordination.