Page 56 - Barr&Barr_RiversEdge_10.19.17(Flipbook)
P. 56
The Mary Wade Home
Kimberly Building Skilled Nursing Facility, New Haven, CT
CONSTRUCTION COST COMPLETION DATE OWNER
$8.5 million 2010 The Mary Wade Home
SCHEDULE CONTRACT TYPE ARCHITECT
12 months Construction Manager-at-Risk Kenneth Boroson Architects
PROJECT DETAILS
Th e multi-phased expansion featured a renovation and addition to the • Renovations included upgrades to the
existing Kimberly Building Skilled Nursing Facility in order to create architectural fi nishes, mechanical, electrical
space for 34 additional beds (bringing the facility’s total to 90). Th e and plumbing systems and replacement of the
project also doubled the capacity for the adult day center allowing the existing roofi ng system.
Home to accommodate 100 clients per day
• Th ree-story steel framed addition included a full
height basement.
• Facade features a combination of masonry
veneer at the ground fl oor level with Exterior
Insulation Finish System (EIFS) on the upper
stories.