Page 11 - Feed Lab
P. 11
Suguna Management System Ver 1.0 / RR / FQL / 01 Page 1 of 1
1. Head - Feed & Nutrition
soon as possible.
RESPONSIBILITY
FDevelopment & standardization of gut health FTo grant concessions in raw material and finished
analysis schedule procedures in broiler, breeder & products.
layers.
FAudit conduct and approval
FPeriodical visits to feed mills, broiler, breeder & layer
FReview and recommend. Technical clearance to
farms to assess the gut health status and new and capital equipment.
monitoring implementation status of the same.
FTo Conduct Feeding trials on suitable gutt health ACCOUNTABILITY
improvement programs in all our broiler, breeder & FContinuous monitoring of uniform implementation
layers of gut health analysis schedule procedures thus
reducing the FCR and improving performance in
FProposal and co-ordinate the trials of new product broilers.
that gives maximum returns on investment
FTo ensure the gut health status of our all our broiler,
FStandardization of raw material and finished feed breeder & layer birds for improved performance.
analysis schedule procedures at NIR labs
FPlanning and correct usage of the AGP's and
FMonitoring the effective functioning of all NIR feed ACP's and pre / probiotics.
laboratories of respective region by periodical
technical audit. FFeed formulation efficiency.
FDeveloping standard feed lab design with the FAvoiding losses due to breakage in Gut integrity
details of various infra-structure required including FReduction of feed cost & ensuring optimum
man power for setting up of new feed mill lab in any nutrition & performance in poultry
new feed mill of their respective region.
FFor better quality control, in comparison with wet
AUTHORITY chemistry.
FFormat, Check and Approve.
FTo ensure continuous functioning of feed mill.
FCheck on the premix used at feedmill level.
FFor effective and quick quality control.
FTrouble shooting in case of any outbreaks of gut
FTo create and utilize the new infrastructure properly.
health problems, intervene to solve the same as
Prepared by : Approved by :
3 Director - Technical