Page 1579 - draft
P. 1579

COMPOSITE PLAN GENERAL NOTES
                                            A.  INTERIOR WALLS ARE CENTERED ON GRIDS, U.N.O.
                                            B.  CONCRETE MASONRY UNITS ARE CENTERED ON
                                             GRIDS FOR EXTERIOR CAVITY WALLS, TYPICAL, U.N.O.
                                                            ARCHITECTS:
                                            C.  SEE STRUCTURAL DRAWINGS AND SCHEDULES FOR
                                             MASONRY WALL REINFORCEMENT AND/OR GROUTING
                                             REQUIREMENTS.  STR Partners LLC
                                                            350 West Ontario Street | Suite 200
                                             NOTE:  OVERALL EXTERIOR DIMENSIONS FOR  Chicago, IL 60654
                                             REFERENCE ONLY.  VERIFY WALL LOCATIONS WITH
                                             INTERIOR DIMENSIONS.  SEE A1 SERIES SHEETS.  T:  312.464.1444
                                                            www.strpartners.com
                                            LEGEND:         •  CIVIL ENGINEERING:
                                                             ERIKKSON ENGINEERING
                                                             145 Commerce Dr, Suite A
                                               MEP WORK AND/OR ROOF REPLACEMENT  Grayslake, IL 60030
                                               WORK          (847) 223-4804
                                                            •  ROOFING AND BUILDING ENVELOPE:
                                                             STR-SEG
                                               INTERIOR RENOVATION WORK  2015 S. Arlington Heights Road, Suite 108
                                                             Arlington Heights, IL 60005
                                                             (847) 952-9668
                                                            •  STRUCTURAL ENGINEERING:
                                               FINISH UPGRADES  CEA&A STRUCTURAL ENGINEERS
                                                             175 N. Franklin Street Suite 410
                                               (CEILING, LIGHTING, FLOORING & PAINT)  Chicago, IL 60606
                                                             (312) 750-1701
                                                            •  MEP/FP ENGINEERING:
                                                             CS2 DESIGN GROUP
                                                             837 Oakton Street
                                                             Elk Grove Village, IL 60007
                                                             (847) 981-1800
                                                            •  CONSTRUCTION MANAGER:
                                                             PEPPER CONSTRUCTION
                                                             643 North Orleans Street
                                                             Chicago, IL 50554
                                                             (312) 266-4700
  NEW FIELD HOUSE
 NEW FIELD HOUSE  ADDITION - REFER TO                       K  E Y    P L A  N
 ADDITION - REFER TO  STR PROJECT # 20005
 STR PROJECT # 20005
 AREA 16
 AREA 19
                                1
                                SO-A4.0
                                                            S C  O  P  E    D  O  C  U  M  E  N  T
                                 VEST.                      This drawing is one drawing within a complete set of documents and shall not
                                 CHOIR  CL44  CL44  CL44    be considered separately from the Drawings as a whole. The Drawings
                                CL44
                               CL44
 AREA 15                      CL44  OFFICE                  indicate the general scope of the project in terms of architectural design
                                 M-100A
                              CL44  CL44  BAND
                            WEIGHT  CL44  OFFICE  CL44  CL44  CL44  INTERIOR  concept, the dimensions of the building, the major architectural elements and
                               CL44
                            ROOM  ORCHESTRA/CHOIR  M-105A
                            C-146  CL44  M-100  CL44  CL44  CL44  CL44  RENOVATION  the type of structural, mechanical, and electrical systems.   As Scope
                                                            Documents, the Drawings do not necessarily indicate or describe all work
 AREA 6                       CL44  CL44  CL44  STORAGE  BAND M-105 CL44  required for full performance and completion of the requirements of the
                                 M-105B
                              CL44  CL44  CL44  ORCH.  CL44  CL44  Construction Documents. On the basis of the general scope indicated or
                                                            described, the Contractor shall furnish all items required for the proper
                                 OFFICE
                               INSTRUMENT M-100B  CL44  CL44  CL44  execution and completion of the Work.
                                STORAGE
                                M-106  CL44
                             VEST.  CL44  CL44              Copyright Notice, Copyright  ©  2019 STR PARTNERS LLC
                                                            The information in this document is the intellectual property of STR Partners
 AREA 7               REFER TO FIELDHOUSE  NEW CON.  P.E. OFFICE C-144  PRACT. M-102 PRACT. M-103  CL44  CL44  CL44  LLC.  It is intended solely for use by the “Client” during only this specific
                      PROJECT FOR DEMOLITION &  C-145
                      CONSTRUCTION DWGS.
                              PRACT.  PRACT.                project.  Reproduction of any portion of this document for any purpose other
                              M-101  M-104 VEST.            than for its intended use is not permitted without specific written permission of
                                                            STR Partners LLC.
                             VEST V E S T  FUTURE CORR.
 AREA 17
                                                            P  R  O  J E C  T
 AREA 14  EXIST. COL. BELOW  BOYS  CONC  GYM LOBBY  CONC  GIRLS  UTIL  LOCKER RM TEAM  LOCKER RM TEAM  LOCKER RM TEAM
 ROOF
                       C-113   C-119-1  C-119-2  C-119-3  C-120  D227 SUMMER 2021
 AREA 18  NEW HVAC RTU ON  LOADING DOCK  E  CLST  SO-A4.0 1
 EXIST. COL.  STEEL FRAMING  127  OFFICE                    RENOVATIONS
 EXIST.  EXIST.  ROOF BELOW  SPRINKLER  E ELEC L 116 E C  C-118  BOYS
            ROOM
 BELOW COL.  BELOW COL.  119    LOCKER RM
 ROOF  ROOF                     C-122  LOCKERS
            PIANO             TRAINER
            ROOM 121  SET CONST  C-117  C-121               5000 Sauk Trail
 AREA 13  AREA 10A  AREA 10B  STAIR  PIANO STOR  CLASSROOM 117
           S-2                     SHOWER                   Richton Park, IL 60471
            STAGE                  C-125
            VEST       GYM        STOR
       VEST  113       C-110   LOCKERS
      STAIR  107              OFFICE  C-128
      S-5                     C-129  DRYING
                DIMMER           C-126
    GALLERY  A/V  SIDE  EQ RM
     101  STOR  STAGE
 AREA 1  AREA 5A  108  109  CORR  OFFICE  DRYING C-133
                 C-02         C-130  SHOWER
                               LOCKERS  C-136
     BOX                       C-131  STOR
     OFC 102   DRESSING BOYS
 AREA 10E       124                 BOILER ROOM
       HOUSE  STAGE             GIRLS  STOR  B
 AREA 10C  AREA 10D  AREA 9  108  111  DRESSING GIRLS  LOCKER RM C-138
                125                                         RICH TOWNSHIP HIGH SCHOOL
                                      G
                              V                  RECEIVING
                JAN         AD SEC                136       DISTRICT 227
                            C-142  E  T
 AREA 5C       COSTUME  CHEER / DANCE
           SIDE  WK RM  GYMNASIUM                  OFFICE   20550 South Cicero Avenue
           STAGE  122  C-108  AD  INTERIOR  DRY STORAGE  135A
           110              OFFICE  CORR/  RENOVATION  137
 ROOF REPLACEMENT  VEST  STAGE VEST  GYM STOR C-109  STOR C-107  VEST C-141  JAN 139  LOCKERS 135B TLT  Matteson, IL 60443
 INCLUDING SOME MEP ON ROOF  105  114  CENTERLINE  MEP WORK - SEE MEP DRAWINGS  DISHWASHING TRAY  135C  TLT
                      OF WALL
 AREA 10F  AREA 10G  - SEE MEP & ROOFING  AREA 11A  VEST 103  LOBBY 104  WOMEN T-02  MEN T-01  STAIR S-1  CORR COSTUME STOR 112  C-103D OFF.  F KITCHENETTE DW  FOR ADDITIONAL INFORMATION  138  KITCHEN 135  134A TLT 134B  C  L I E N  T   P R  O  J E C  T   N  U  M  B  E R
 DRAWINGS FOR FURTHER
                           F
                            C-103E
 INFORMATION
 AREA 10H     BOYS B-120 C-01  N-WEST  OFF. C-103C OFF.  TEACHER WORKROOM  C-104A C-104B  V  TLT  MAINT /  STORAGE D-135  FACULTY DINING 134  S T R   P R  O  J E C  T   N  U  M  B  E R
                           OFF. OFF.
 A      NOT USED B-107  GEN ED B-109  GEN ED B-111  STAIR 1  3 HR. RATED EXISTING  WALL  C-103B C-103A OFF.  GATHERING 3 HR. RATED EXISTING  WALL  LOUNGE CUST.  RECEIVING D-133  MECH D-134  STORAGE D-136  MANUFACTURING  CORR 114  SERVING LINES 133  20046
                           TEACHER
                     C-103
                            C-104
                                        D-138
 AREA 11E  ART  STOR  3 HR. RATED EXISTING  WALL 3 HR. RATED EXISTING   W 3 HR. RATED EXISTING  WALL3 HR. RATED EXISTING  WALLHR. RATED EXISTING  WALL  D-130  STORAGE D-137  D  R  A  W  I N  G    D  A  T E S

                           3
                      L
                      A
                      L
      B-105
                    CORR 101        CORRIDOR         VESTIBULE
 MEP WORK - SEE MEP  LANG ARTS  CNSLR  ELEC  MDF  113  131  NUMBER  DATE  COMMENTS
 DRAWINGS FOR  OFFICE  OFFICE  OFFICE  D113  SMALL  BOYS  GIRLS  PERIOD-  D144
 ADDITIONAL INFORMATION  KILN  B-108  B-110  B-115  GRP D106  ICAL STOR  BLDGS &  CULTURE &  STOR  BOYS
     B-105A               D105  GROUNDS  CLIMATE  125  SEPARATE  •
                            CONF  OFFICE  OFFICE     LUNCH
                            D104  RECORDS  NURSE  TOOL  CULINARY  JAN  AREA 132
     B-103A         FINISH UPGRADES  D-138  ROOM OFFICE  ARTS CAFE  CULINARY  •
          GEN ED  GEN ED  GEN ED  SMALL  D-140  ARTS
          B-106  B-112  B-117  (CORRIDOR & STAIRS)  GRP  LAB  GIRLS
                            D103  COMPUTER  126
                CORR 100A       LAB D132  OFFICE            •
 AREA 3A  AREA 4A  AREA 4B  AREA 2  AREA 11B  MEDIA  OFFICE PRAC OFFICE  STOR  CHAIR STORAGE  •
                    CENTER  WORK          D-147  127
      BIOLOGY       D100    ROOM  CORR  D-152  D-151  D-150
      B-103                 D102  111
          GEN ED  GEN ED  GEN ED  GEN ED  CORR   CAFETERIA  •
          B-104  B-114  B-119                    129
                                     PRAC  STOR
                                D133
                                  LARGE GROUP INSTRUCTION D-156  D-159
                            LIBRARIAN  D-160  STOR  PRAC LARGE GROUP INSTRUCTION  •
              MEN           OFFICE D101  D-155  D-158  D-149  VIRTUAL
              TLT  GIRLS                   REALITY ROOM     •
                                GEN ED     128
      GEN ED  GEN ED  GEN ED  JAN    STOR  STOR
      B-101  B-102  B-116       115  D153  D154
                                                            •
                                          STOR              •
                                CORRIDOR  D-148
                       CORR     112
        VEST           100B          CORRIDOR
                                      139       VEST        •
 AREA 11C  AREA 11D  UP  BOYS  PHONE            138
         OFFICE  GEN ED  OFFICE                             •
         B-127  B-125    DATA  S-EAST
               S-WEST  SP ED  A-116A  STAIR 5
               STAIR 2 UP  A-117  SP ED A-116  FINISH UPGRADES
 AREA 12  FAR S-WEST  WMN TLT             (WALL PAINT, FLOORING,  •
       STAIR 3
         "BELIEVE"          GIRLS
         SP ED     JAN  STORAGE  142      CEILING SYSTEM AND  •
         B-124                            LIGHT FIXTURES)
               STOR       STOR
             READING     OFFICE A-112                       •
             INTERVENTION  GEN ED  OFFICE  GEN ED
             SP ED
 AREA 3B  AREA 3C  B-126  JAN  A-120  A-115  A-114          • •   3   MAR. 17, 2021   ISSUE FOR BID & PERMIT
                           GEN ED
                         SP ED  A-115
                         A-110      NEW ENTRY - REFER TO    • •   2   MAR. 15, 2021   100% REVIEW
         GEN ED            OFFICE   STR PROJECT # 20005
         B-123  MDF        A-113
                  GEN ED  GEN ED  GEN ED                    •   1   FEB. 8, 2021   75% REVIEW
            GEN ED  A-102  A-104  A-106
             B-122  ATTEN-
               DANCE     OFFICE
               A-122     A-108
                           OFFICE
                           A-111                            D  R  A  W  I N  G    T I T L E
                  SEC-                                      SOUTH CAMPUS
                VEST  A-101A URITY  RECEPTION A-101
 2 IN          SOUTH STAIR 4 FAR  GEN ED  GEN ED  GEN ED  GEN ED
                     A-103  A-105  A-107  A-109  MATCHLINE
                  CONF  CONF                                FAC(SO) COMPOSITE
                  A-101B  A-101C                            FLOOR PLANS
 Actual size to read at scale  1 IN  2  COMPOSITE PLAN - ROOF  1  COMPOSITE PLAN - FIRST FLOOR  N  S H  E E T   N  U  M  B  E R
 0 IN  SCALE: 1"   = 40'  SCALE: 1"   = 40'                 SO-A0.0
   1574   1575   1576   1577   1578   1579   1580   1581   1582   1583   1584