Page 1578 - draft
P. 1578
COMPOSITE PLAN GENERAL NOTES
A. INTERIOR WALLS ARE CENTERED ON GRIDS, U.N.O.
B. CONCRETE MASONRY UNITS ARE CENTERED ON
GRIDS FOR EXTERIOR CAVITY WALLS, TYPICAL, U.N.O.
ARCHITECTS:
C. SEE STRUCTURAL DRAWINGS AND SCHEDULES FOR
MASONRY WALL REINFORCEMENT AND/OR GROUTING
REQUIREMENTS. STR Partners LLC
350 West Ontario Street | Suite 200
NOTE: OVERALL EXTERIOR DIMENSIONS FOR Chicago, IL 60654
REFERENCE ONLY. VERIFY WALL LOCATIONS WITH
INTERIOR DIMENSIONS. SEE A1 SERIES SHEETS. T: 312.464.1444
www.strpartners.com
LEGEND: • CIVIL ENGINEERING:
ERIKKSON ENGINEERING
145 Commerce Dr, Suite A
MEP WORK AND/OR ROOF REPLACEMENT Grayslake, IL 60030
WORK (847) 223-4804
• ROOFING AND BUILDING ENVELOPE:
STR-SEG
INTERIOR RENOVATION WORK 2015 S. Arlington Heights Road, Suite 108
Arlington Heights, IL 60005
(847) 952-9668
• STRUCTURAL ENGINEERING:
FINISH UPGRADES CEA&A STRUCTURAL ENGINEERS
175 N. Franklin Street Suite 410
(CEILING, LIGHTING, FLOORING & PAINT) Chicago, IL 60606
(312) 750-1701
• MEP/FP ENGINEERING:
CS2 DESIGN GROUP
837 Oakton Street
Elk Grove Village, IL 60007
(847) 981-1800
• CONSTRUCTION MANAGER:
PEPPER CONSTRUCTION
643 North Orleans Street
Chicago, IL 50554
(312) 266-4700
NEW FIELD HOUSE
NEW FIELD HOUSE ADDITION - REFER TO K E Y P L A N
ADDITION - REFER TO STR PROJECT # 20005
STR PROJECT # 20005
AREA 16
AREA 19
1
SO-A4.0
S C O P E D O C U M E N T
VEST. This drawing is one drawing within a complete set of documents and shall not
CHOIR CL44 CL44 CL44 be considered separately from the Drawings as a whole. The Drawings
CL44
CL44
AREA 15 CL44 OFFICE indicate the general scope of the project in terms of architectural design
M-100A
CL44 CL44 BAND
WEIGHT CL44 OFFICE CL44 CL44 CL44 INTERIOR concept, the dimensions of the building, the major architectural elements and
CL44
ROOM ORCHESTRA/CHOIR M-105A
C-146 CL44 M-100 CL44 CL44 CL44 CL44 RENOVATION the type of structural, mechanical, and electrical systems. As Scope
Documents, the Drawings do not necessarily indicate or describe all work
AREA 6 CL44 CL44 CL44 STORAGE BAND M-105 CL44 required for full performance and completion of the requirements of the
M-105B
CL44 CL44 CL44 ORCH. CL44 CL44 Construction Documents. On the basis of the general scope indicated or
described, the Contractor shall furnish all items required for the proper
OFFICE
INSTRUMENT M-100B CL44 CL44 CL44 execution and completion of the Work.
STORAGE
M-106 CL44
VEST. CL44 CL44 Copyright Notice, Copyright © 2019 STR PARTNERS LLC
The information in this document is the intellectual property of STR Partners
AREA 7 REFER TO FIELDHOUSE NEW CON. P.E. OFFICE C-144 PRACT. M-102 PRACT. M-103 CL44 CL44 CL44 LLC. It is intended solely for use by the “Client” during only this specific
PROJECT FOR DEMOLITION & C-145
CONSTRUCTION DWGS.
PRACT. PRACT. project. Reproduction of any portion of this document for any purpose other
M-101 M-104 VEST. than for its intended use is not permitted without specific written permission of
STR Partners LLC.
VEST V E S T FUTURE CORR.
AREA 17
P R O J E C T
AREA 14 EXIST. COL. BELOW BOYS CONC GYM LOBBY CONC GIRLS UTIL LOCKER RM TEAM LOCKER RM TEAM LOCKER RM TEAM
ROOF
C-113 C-119-1 C-119-2 C-119-3 C-120 D227 SUMMER 2021
AREA 18 NEW HVAC RTU ON LOADING DOCK E CLST SO-A4.0 1
EXIST. COL. STEEL FRAMING 127 OFFICE RENOVATIONS
EXIST. EXIST. ROOF BELOW SPRINKLER E ELEC L 116 E C C-118 BOYS
ROOM
BELOW COL. BELOW COL. 119 LOCKER RM
ROOF ROOF C-122 LOCKERS
PIANO TRAINER
ROOM 121 SET CONST C-117 C-121 5000 Sauk Trail
AREA 13 AREA 10A AREA 10B STAIR PIANO STOR CLASSROOM 117
S-2 SHOWER Richton Park, IL 60471
STAGE C-125
VEST GYM STOR
VEST 113 C-110 LOCKERS
STAIR 107 OFFICE C-128
S-5 C-129 DRYING
DIMMER C-126
GALLERY A/V SIDE EQ RM
101 STOR STAGE
AREA 1 AREA 5A 108 109 CORR OFFICE DRYING C-133
C-02 C-130 SHOWER
LOCKERS C-136
BOX C-131 STOR
OFC 102 DRESSING BOYS
AREA 10E 124 BOILER ROOM
HOUSE STAGE GIRLS STOR B
AREA 10C AREA 10D AREA 9 108 111 DRESSING GIRLS LOCKER RM C-138
125 RICH TOWNSHIP HIGH SCHOOL
G
V RECEIVING
JAN AD SEC 136 DISTRICT 227
C-142 E T
AREA 5C COSTUME CHEER / DANCE
SIDE WK RM GYMNASIUM OFFICE 20550 South Cicero Avenue
STAGE 122 C-108 AD INTERIOR DRY STORAGE 135A
110 OFFICE CORR/ RENOVATION 137
ROOF REPLACEMENT VEST STAGE VEST GYM STOR C-109 STOR C-107 VEST C-141 JAN 139 LOCKERS 135B TLT Matteson, IL 60443
INCLUDING SOME MEP ON ROOF 105 114 CENTERLINE MEP WORK - SEE MEP DRAWINGS DISHWASHING TRAY 135C TLT
OF WALL
AREA 10F AREA 10G - SEE MEP & ROOFING AREA 11A VEST 103 LOBBY 104 WOMEN T-02 MEN T-01 STAIR S-1 CORR COSTUME STOR 112 C-103D OFF. F KITCHENETTE DW FOR ADDITIONAL INFORMATION 138 KITCHEN 135 134A TLT 134B C L I E N T P R O J E C T N U M B E R
DRAWINGS FOR FURTHER
F
C-103E
INFORMATION
AREA 10H BOYS B-120 C-01 N-WEST OFF. C-103C OFF. TEACHER WORKROOM C-104A C-104B V TLT MAINT / STORAGE D-135 FACULTY DINING 134 S T R P R O J E C T N U M B E R
OFF. OFF.
A NOT USED B-107 GEN ED B-109 GEN ED B-111 STAIR 1 3 HR. RATED EXISTING WALL C-103B C-103A OFF. GATHERING 3 HR. RATED EXISTING WALL LOUNGE CUST. RECEIVING D-133 MECH D-134 STORAGE D-136 MANUFACTURING CORR 114 SERVING LINES 133 20046
TEACHER
C-103
C-104
D-138
AREA 11E ART STOR 3 HR. RATED EXISTING WALL 3 HR. RATED EXISTING W 3 HR. RATED EXISTING WALL3 HR. RATED EXISTING WALLHR. RATED EXISTING WALL D-130 STORAGE D-137 D R A W I N G D A T E S
3
L
A
L
B-105
CORR 101 CORRIDOR VESTIBULE
MEP WORK - SEE MEP LANG ARTS CNSLR ELEC MDF 113 131 NUMBER DATE COMMENTS
DRAWINGS FOR OFFICE OFFICE OFFICE D113 SMALL BOYS GIRLS PERIOD- D144
ADDITIONAL INFORMATION KILN B-108 B-110 B-115 GRP D106 ICAL STOR BLDGS & CULTURE & STOR BOYS
B-105A D105 GROUNDS CLIMATE 125 SEPARATE •
CONF OFFICE OFFICE LUNCH
D104 RECORDS NURSE TOOL CULINARY JAN AREA 132
B-103A FINISH UPGRADES D-138 ROOM OFFICE ARTS CAFE CULINARY •
GEN ED GEN ED GEN ED SMALL D-140 ARTS
B-106 B-112 B-117 (CORRIDOR & STAIRS) GRP LAB GIRLS
D103 COMPUTER 126
CORR 100A LAB D132 OFFICE •
AREA 3A AREA 4A AREA 4B AREA 2 AREA 11B MEDIA OFFICE PRAC OFFICE STOR CHAIR STORAGE •
CENTER WORK D-147 127
BIOLOGY D100 ROOM CORR D-152 D-151 D-150
B-103 D102 111
GEN ED GEN ED GEN ED GEN ED CORR CAFETERIA •
B-104 B-114 B-119 129
PRAC STOR
D133
LARGE GROUP INSTRUCTION D-156 D-159
LIBRARIAN D-160 STOR PRAC LARGE GROUP INSTRUCTION •
MEN OFFICE D101 D-155 D-158 D-149 VIRTUAL
TLT GIRLS REALITY ROOM •
GEN ED 128
GEN ED GEN ED GEN ED JAN STOR STOR
B-101 B-102 B-116 115 D153 D154
•
STOR •
CORRIDOR D-148
CORR 112
VEST 100B CORRIDOR
139 VEST •
AREA 11C AREA 11D UP BOYS PHONE 138
OFFICE GEN ED OFFICE •
B-127 B-125 DATA S-EAST
S-WEST SP ED A-116A STAIR 5
STAIR 2 UP A-117 SP ED A-116 FINISH UPGRADES
AREA 12 FAR S-WEST WMN TLT (WALL PAINT, FLOORING, •
STAIR 3
"BELIEVE" GIRLS
SP ED JAN STORAGE 142 CEILING SYSTEM AND •
B-124 LIGHT FIXTURES)
STOR STOR
READING OFFICE A-112 •
INTERVENTION GEN ED OFFICE GEN ED
SP ED
AREA 3B AREA 3C B-126 JAN A-120 A-115 A-114 • • 3 MAR. 17, 2021 ISSUE FOR BID & PERMIT
GEN ED
SP ED A-115
A-110 NEW ENTRY - REFER TO • • 2 MAR. 15, 2021 100% REVIEW
GEN ED OFFICE STR PROJECT # 20005
B-123 MDF A-113
GEN ED GEN ED GEN ED • 1 FEB. 8, 2021 75% REVIEW
GEN ED A-102 A-104 A-106
B-122 ATTEN-
DANCE OFFICE
A-122 A-108
OFFICE
A-111 D R A W I N G T I T L E
SEC- SOUTH CAMPUS
VEST A-101A URITY RECEPTION A-101
2 IN SOUTH STAIR 4 FAR GEN ED GEN ED GEN ED GEN ED
A-103 A-105 A-107 A-109 MATCHLINE
CONF CONF FAC(SO) COMPOSITE
A-101B A-101C FLOOR PLANS
Actual size to read at scale 1 IN 2 COMPOSITE PLAN - ROOF 1 COMPOSITE PLAN - FIRST FLOOR N S H E E T N U M B E R
0 IN SCALE: 1" = 40' SCALE: 1" = 40' SO-A0.0