Page 18 - UNIT 5- FLEXIBLE PAVEMENT DESIGN
P. 18
Civil Engineering Department | DCC3113 : Highway & Traffic Engineering
Example
120 kN 100 kN 80 kN
The total load of a commercial vehicle is 300kN and is transmitted to the pavement
via three axles. The first axle is 120kN, second 100kN and the third is 80kN. The value
of equivalent factor, F.
e = (L/Ls)
4
e = (120/80) + (100/80) + (80/80)
4
4
4
e = 8.50
HOME
Prepared by : SITI ZURAIFA BINTI MD SAH, zuraifa@pmu.edu.my