Page 18 - UNIT 5- FLEXIBLE PAVEMENT DESIGN
P. 18

Civil Engineering Department  | DCC3113 : Highway & Traffic Engineering




                                                                 Example






















                                                          120 kN                           100 kN    80 kN



                 The total load of a commercial vehicle is 300kN and is transmitted to the pavement
                 via three axles. The first axle is 120kN, second 100kN and the third is 80kN. The value
                 of equivalent factor, F.

                 e             =              (L/Ls)
                                                     4
                 e             =              (120/80)  + (100/80)  + (80/80)
                                                                                      4
                                                         4
                                                                        4
                 e             =              8.50






                                                                                                                                   HOME
          Prepared by : SITI ZURAIFA BINTI MD SAH, zuraifa@pmu.edu.my
   13   14   15   16   17   18   19   20   21   22   23