Page 48 - UNIT 6 - HIGHWAY MAINTENANCE
P. 48

Civil Engineering Department  | DCC3113 : Highway & Traffic Engineering




                                                                Recycling





               Involves the following:
              ~ Remove existing pavement fully or partially

              ~ Reduce reclaimed material to suitable size

              ~ Blending reclaimed materials with virgin
                   aggregate & liquid asphalt.

              ~ Relaying the material as base or surface
                  course


               Advantages of Hot Mix Recycling
              -  Economy

              -  Conservation of national resources

              -  Improvement o f the structural strength of

                 the pavement with little or no change  in

                 thickness
              - Correction of existing deficiencies in the

                 pavement mix.








          Prepared by : SITI ZURAIFA BINTI MD SAH, zuraifa@pmu.edu.my
   43   44   45   46   47   48   49   50   51   52   53