Page 15 - UNIT 3 - CONSTRUCTION OF FLEXIBLE PAVEMENT
P. 15
Civil Engineering Department | DCC3113 : Highway & Traffic Engineering
Concept Dry Bound Macadam Road Base
• Graded aggregate mixture: coarse aggregate size of 37.5 mm or 50 mm and fine
aggregate size of 5 mm to filler size
• Separated into two layers with 75 mm to 100 mm thickness and compact
• Spread the 25 mm - 50 mm thickness of fine aggregate (sand) to fill the void and
compacted
• Advantage:
Avoid aggregate isolation occurs during trip
Low of cost
• Disadvantages:
When it rainy, fine aggregates will wet and cannot fill the void
HOME
Prepared by : SITI ZURAIFA BINTI MD SAH, zuraifa@pmu.edu.my