Page 15 - UNIT 3 - CONSTRUCTION OF FLEXIBLE PAVEMENT
P. 15

Civil Engineering Department  | DCC3113 : Highway & Traffic Engineering





   Concept                                Dry Bound Macadam Road Base




          •    Graded aggregate mixture: coarse aggregate size of 37.5 mm or 50 mm and fine
               aggregate size of 5 mm to filler size

          •    Separated into two layers with 75 mm to 100 mm thickness and compact
          •    Spread the 25 mm - 50 mm thickness of fine aggregate (sand) to fill the void and
               compacted

          •    Advantage:
                    Avoid aggregate isolation occurs during trip

                    Low of cost
          •    Disadvantages:

                    When it rainy, fine aggregates will wet and cannot fill the void





















                                                                                                                                   HOME
          Prepared by : SITI ZURAIFA BINTI MD SAH, zuraifa@pmu.edu.my
   10   11   12   13   14   15   16   17   18   19   20