List of Projects Implemented in 2013
No. Project Description Contractor Contract Sum
16 Pembinaan Jambatan menyeberangi Sungai Pandaruan - Pembinaan Jalan Pekerjaan Piasau Konkerit Sdn Bhd 22,759,582.19
Tuju disebelah Malaysia. PWD/HO/B052/2013 JKR/IP/CKUB/09/2013
17 Cadangan Ubahsuai Naiktaraf bengkel-bengkel di SMT Miri, Bahagian Miri, Era Technology 2,468,000.00
Sarawak. PWD/HO/B035/2013
18 Cadangan Pembinaan dan Penyiapan 1 Blok, Bengkel Eletronik di SMT Miri, Era Technology 2,468,000.00
Bahagian Miri, Sarawak. PWD/HO/B036/2013 Tender No : T/340/10/2012
19 Construction and Completion of the proposed Artificial Turf Football Field to Cergas Asli Sdn Bhd 2,775,907.50
Padang 'B' Dewan Suarah, Bintulu. PWD/HO/B049/2013
20 The proposed site investigation, survey, design, supply, delivery, construction, Daya Timur Construction Sdn Bhd 1,693,000.00
completion, including testing and commisioning of a new elevated tank and
re tower structire at Kuala Lawas Water Treatment plant, Lawas, Limbang
Division. PWD/HO/B039/2013
21 Projek Bekalan Air Luar Bandar (BALB) Ke Kpg. Bambangan/Braong, MSD Entreprise Sdn Bhd 1,416,339.00
Limbang, Sarawak. PWD/HO/B065/2013 KKLW/BALB/3/2013
22 Subsurface Investigation works for bekalan air Samalaju, Bahagian Geospec Sdn Bhd 930,210.00
Bintulu,Sarawak, Phase 1 Stage 3B : Proposed Sg. Similaju Reservoir and
Associated Facilities. PWD/HO/B071/2013