Page 87 - Area X - H
P. 87

•   Submission o f required reports/plan to oversight   2.  Timeliness o f submission o f APP to oversight agency  (To be set by   G ASS Form
 agencies               Procurem ent Office    H D U  and
                                               HSU)
 3.  Timeliness  o f  submission  o f  A PCPI  to  oversight   (To be set by   GASS Form
 agency                 Procurem ent Office    H D U  and
                                               HSU)
 4.  Timeliness  o f  submission  o f  land  use  plan  per   O P  D ISD  (To be set by   GASS Form
 N E D A ’s  deadline/or  as  instructed  by  the  university   H D U  and
 president                                     HSU)
 5.  Timeliness  o f submission  o f the  TRIP  per  N E D A ’s   (To be set by   GASS Form
 deadline               Procurem ent Office    H D U  and
                                               HSU)
 6.  Timeliness  o f  submission  o f  APP  to  update  the   (To be set by   GASS Form
 transparency seal      Procurem ent Office    H D U  and
                                               HSU)
 •    PhilGEPS posting  7.  M aintain/update  posting  o f  bids  and  awarded   O P  D ISD  (To be set by   GASS Form
 contracts in the PhilG EPS                    H D U  and
                                               HSU)
 1.3.   D PIM T          O P      D PIM T      (To be set by   G ASS Form
                                               H D U  and
                                               HSU)
 •   Planning, m onitoring and evaluation o f University   1.  Updating  of  the  university’s  Transparency  Seal  per   O P  D PIM T  (To be set by  GASS Form
 PAPs  IA TF M emo Circular                    F ID U and
                                               HSU)
 2.   Quarterly  submission  o f  Budget  Accountability   O P  D PIM T  (To be set by   GASS Form
 Report  (BAR)  through  DBM ’s  unified  reporting   H D U  and
 system                                        HSU)
 3.  Submission  o f  Form   A  &  A1  (Accomplishment   OP  D PIM T  (To be set by   GASS Form
 Report  for  PBB  evaluation)  on  deadline  per  IATF-   H D U  and
 M emo Circular                               _h s u )__________
 4.  Submission o f Annual Action Plan /  Strategic Plan (45   OP  D PIM T  (To be set by   GASS Form
 days after end o f the planning activities)   H D U  and
                                               HSU)
 5.  Submission  o f Annual  Report  on  due  date  (1st  draft,   O P  D PIM F  (To be set by   GASS Form
 45 days after end o f the year)               H D U  and
                                               HSU)
 6.  Submission  o f O PC R  report ranking o f D U s  on due   O P  D PIM T  (To be set by  GASS Form
 date  (per  deadline  o f submission o f Form   1.0  by the   FID U and
 FIRD)                                         HSU)


 15
   82   83   84   85   86   87   88   89   90   91   92