Page 295 - Area X - G
P. 295

N ote:  C SC  M em orandum  C ircular No.  6,  s.  2012,  p.  7 (G uidelines on the E stablishm ent o f A gency SPM S) p ro vides that,  “U nless the  work output o f a particular
 duty has been assigned pre -set standards by m anagem ent, its standards shall be a gree d  upon b y the supervisors and the ra te e s”.  Thus, perform ance standards
 fo r core o r support functions p erfo rm ed  by em ployees that are n o t found in this  Table o f Reference shall be a greed upon by the supervisor and the em ployee.___
                               Responsible         Means of
               Detailed
                               Delivery Unit     Verification
 KRA  Program  Projects/Activities  Performance Indicator  Information/
                                                  (Supporting
           Minimum Target
                                                  Document)
                                                true and correct
                                                  by the HDU
 % of ICT services acted on requested   90%  DPIM  Summary
 Job orders                                     Report certified
                                                true and correct
                                                  by the HDU
 % of CCTV installed on critical areas  90%  DPIM  Summary
                                                Report certified
                                                true and correct
                                                  by the HDU
 Timeliness of submission of policy on   2019  DPIM  Summary
 CCTV for approval                               Report certified
                                                true and correct
                                                  by the HDU
 No. of campuses with  ICT office and   1  DPIM    Summary
 infrastructure established                      Report certified
                                                true and correct
                                                  by the HDU
 No.  of sports facilities modernized  DPES        Summary
                                                 Report certified
                                                true and correct
                                                  by the HDU
 % of preparation in the establishment of   97%  IGP,  DPIM  Summary
 an online reservation system                    Report certified
                                                true and correct
                                                   by the HDU
 No.  of e-budgeting and e-NGAs     DFS             Summary
 acquired and installed                          Report certified
                                                 true and correct
                                                   by the HDU

 4 6
   290   291   292   293   294   295   296   297   298   299   300