Page 63 - Property Rights in the Philippine A Time and Cost Study_July 2017
P. 63

Actor
                                                                            Geodetic Engineer                                                                                         Average of 1-10 lots per
                                                   1.  Survey                                                  1.  Corners installed with
                                            4.2        equipment                                                    boundary monuments                                                day, depends on the
                                                   2.  Survey aide/s        Activity                           2.  Recorded measurements                                              number and size of lots
                                                                                                                                                                                      to be surveyed
                                                                            Conducts survey (constantly
                                                                            consults claimants)

                                                                            Actor
                                                                            GE
                                            4.3    Recorded                                                    Autocad dwg file of lot surveyed
                                                   measurements
                                                                            Activity
                                                                            Completes lot survey

                                                                            SUBMISSION OF SURVEY
                                                                                      RETURNS


                                             5                              Actor
                                                                            Geodetic Engineer, Clerk


                                                                            Activities






                                                   Checklist of
                                                   Requirements             Actor
                                                   (See Annexes)            GE

                                                   •   Annex A – List of
                                            5.1        Requirements         Activity                           Compiled requirements                                                  5 days
                                                   •   Annex B –            Ensures that all requirements
                                                       Requirements for  are attached to the survey
                                                       Isolated Survey      returns (Checklist)
                                                       (Kinds of Survey)




















                                                                                                                                                                                                            43
   58   59   60   61   62   63   64   65   66   67   68