Page 64 - Property Rights in the Philippine A Time and Cost Study_July 2017
P. 64

Actor
 Geodetic Engineer                                          Average of 1-10 lots per
 1.  Survey   1.  Corners installed with
 4.2   equipment      boundary monuments                    day, depends on the
 2.  Survey aide/s   Activity   2.  Recorded measurements   number and size of lots
                                                            to be surveyed
 Conducts survey (constantly
 consults claimants)

 Actor
 GE
 4.3   Recorded      Autocad dwg file of lot surveyed
 measurements
 Activity
 Completes lot survey

    SUBMISSION OF SURVEY
 RETURNS


 5   Actor
 Geodetic Engineer, Clerk


 Activities






 Checklist of
 Requirements   Actor
 (See Annexes)   GE

 •   Annex A – List of
 5.1   Requirements   Activity   Compiled requirements      5 days
 •   Annex B –   Ensures that all requirements
 Requirements for  are attached to the survey
 Isolated Survey   returns (Checklist)
 (Kinds of Survey)




















                                                                                  43
   59   60   61   62   63   64   65   66   67   68   69